Similar Projects
Painting Services
Alteration
Bidding
PA

James Building Replacement-Painting
Post-Bid
State College, University Park, PA 16801

Paint Sundries Consumables Materials
Post-Bid
Philadelphia, PA

Bridge Painting and Rehabilitation
Results
PA

Propel Braddock Hills High School - Interior Painting
Results
Pittsburgh, PA

Walmart Supercenter #5469-99 - RM-1 Phase I Painting Scope
Construction
Hanover, PA 17331

Painting of Existing Exterior Insulation Finish Systems
Post-Bid
Corry, PA 16407

Propel McKeesport - Exterior Painting
Results
McKeesport, PA 15132

Interior Painting Trinity North Elementary School
Post-Bid
Washington, PA 15301

Steel Elevated Legged Water Storage Tank Reconditioning
Results
Hanover, PA 17331

Interior Painting Trinity West Elementary School
Post-Bid
Washington, PA 15301

Twelve Tubes Drainage Structure Access Platform Painting
Results
Wilkes-Barre, PA 18704

District Wide Painting
Post-Bid
Slippery Rock, PA 16057

Suncrest Drive Standpipe Painting
Results
Carlisle, PA 17013

Hemlock Farms 2020 Road Line Painting
New Construction
Post-Bid
Blooming Grove, PA 18428

Reported 09/04/2021 12:00 AM
Project Title

Plastering and Painting Vacant Units

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA   (Allegheny County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. The contractor shall furnish labor, equipment and transportation necessary for plastering and painting dwelling unit interiors in order to prepare vacant units for occupancy on an as needed basis, throughout City of Pittsburgh Housing Authority Northview Community. 2. The work to be done includes the complete plastering and painting of the apartment units as outline in these specifications. 3. The contractor is required to make a visual inspection of each unit. 4. HACP shall issue work orders for all work assignments. 5. Completion times shall be established prior to the issuance of the work orders. 6. The work to be done includes all labor, equipment and services necessary to provide plaster repair and apply all paints, varnishes, coatings or other related materials.

Details

Division 09 - Finishes, Plaster Fabrications, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents