Similar Projects
PBSO, District 6 - Chiller Replacement
Bidding
Lake Worth, FL 33467

WUD, WTP 3 - Exhaust Fans Replacement
Term Contract
Bidding
Delray Beach, FL 33446

Cooling Tower Replacement
Post-Bid
Less than $2,700,000 est. value
Boca Raton, FL 33431

PBSO Real Time Crime Lab - HVAC Upgrades
Term Contract
Post-Bid
West Palm Beach, FL 33406

PBSO District 3 - HVAC Replacement
Term Contract
Results
West Palm Beach, FL

2019 Commercial Pool Cooler
Results
North Palm Beach, FL 33408

Library Gruber Sandbox Building LY - 3
Post-Bid
Boca Raton, FL 33431

Hagen Ranch Road Library - Chiller Replacement
Results
Delray Beach, FL 33446

Pahokee Housing Authority Padgett Island / Fremd Village HVAC Project
Post-Bid
Pahokee, FL 33476

GCC - Air Handler Unit #11 Replacement
Term Contract
Results
West Palm Beach, FL 33401

Building 12 Animal Lab Renovation
Post-Bid
Boca Raton, FL 33431

MCCH - HVAC Replacement AHU #27
Term Contract
Results
West Palm Beach, FL 33401

Commercial Pool Cooler System
Post-Bid
North Palm Beach, FL 33408

Governmental Center (GCC), HVAC Replacement AHU 6N
Term Contract
Results
West Palm Beach, FL 33401

HVAC and Air Duct Replacement and Installation
Term Contract
Post-Bid
West Palm Beach, FL 33415

Last Updated 02/12/2020 10:15 AM
Project Title

MCCH - HVAC Replacement AHU #28

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33401   (Palm Beach County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove the existing air handler unit 28 on the 11 th Floor of the MCCH and replac with Trane, or PBC approved equal. a. Upgrade the current pneumatic controllers in the rooms to digital controllers. An upgrades have to be compatible with existing Siemens system. b. Provide new chilled water valve on return side. c. Provide new return, supply and fresh air damper actuators. d. Replace all sensors (C02, relative humidity, return temperature/humidity, supplair temp, chilled water temp both in and out, static pressure in the duct, water flooshut down, mixed air temp). e. New thermometers on supply/return chilled water lines. f. Duct cleaning is required to be completed 100 feet in length from the AHU on bot the supply and return ducts. g. Provide and install a new VFD for AHU28 (Yaskawa, ABB or approved equal). h. DDC Controls:

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents