Similar Projects
Salt Lake City New Water Reclamation Facility Project
Sub-Bidding
Less than $400,000,000 est. value
Salt Lake City, UT

Rozel State 18 Well Plug
Post-Bid
Less than $1,674,000 est. value
Salt Lake City, UT

Utah State Correctional Facility Gmp 2.02 Rough Grading and 2.03 Deep Utilities
Post-Bid
Salt Lake City, UT 84116

Main Street Property Development
Results
Less than $120,000 est. value
Midvale, UT

City Hall Entry Improvements Project
Results
Riverton, UT

DFCM Construction-DABC New Herriman Liquor Store
New Construction - 13,600 SF
Construction
Less than $3,100,000 est. value
Herriman, UT

Trucking Yard
New Construction
Pending Verification
Magna, UT

Dutton Cement Work
Post-Bid
Salt Lake City, UT

Frontage Improvement Project
Results
Riverton, UT 84065

Magna Main Street Multiple Site Development
Post-Bid
Magna, UT

Saratoga Springs - Road Development
Results
Less than $6,250,000 est. value
Salt Lake City, UT 84045

Discovery UPC
Post-Bid
$50,000 est. value
Salt Lake City, UT 84104

Construction Bates Central Kitchen, Site Drainage and Grading
Results
West Valley City, UT

Adesa Auto Auction
Renovation
Post-Bid
$550,000 est. value
Salt Lake City, UT 84104

Demolition of Buildings and Site Improvements
Demolition
Results
Less than $50,000 est. value
Salt Lake City, UT

Last Updated 07/22/2019 02:59 PM
Project Title

Z--(Con)(660) Demolish Building 1 G Zone (Va-18-00075144)

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Design-build contractor to provide all labor, materials, tools and equipment necessary to provide design-build services to complete architectural and engineering design, construction period services, abate asbestos/lead, demolish Building 1, G Zone and structural containment of existing remaining adjacent occupied area; the remaining building is required to be protected by the said structural containment for at least 5 years until a separate project not included in this scope of work adds an addition onto this part of the building.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents