Similar Projects
15 Massey Street Parking Lot Expansion
Bidding
Lodi, NJ 07644

Hickory Street and Woodbine Street Improvements
Bidding
Teaneck, NJ

Improvements to Fairview Avenue and Desoto Place
Post-Bid
Fairview, NJ 07022

Boulevard (Section 9) Improvements
Post-Bid
New Milford, NJ 07646

Morrow Road Improvements
Results
Englewood, NJ

Oakland Street and Coolidge Avenue Improvements
Results
Englewood, NJ

Replacement Of Concrete Sidewalk At Lna Site # 57266-Rutherford, Nj
Bidding
Rutherford, NJ

Mattlage Place
Post-Bid
Englewood, NJ 07631

2018 Various Streets Paving
Results

2021 Riverside Cooperative Road Improvement Program
Bidding
Northvale, NJ

Improvements to Ware Road and Old Stone Church Road
Post-Bid
Upper Saddle River, NJ 07458

Green Street Improvements
Results
Teterboro, NJ 07608

CDBG FY2019 Roadway Improvements Pleasant View Terrace
Bidding
Ridgefield, Ridgewood, NJ 07657

Golf Course Drive Retaining Wall
Post-Bid
Leonia, NJ 07605

2019 Road Program
Results
Oakland, NJ 07436

Last Updated 08/17/2020 10:13 AM
Project Title

Monroe Street Improvements and Midland Avenue Curb and Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Garfield, NJ 07026   (Bergen County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Monroe Street: Milling and resurfacing of Monroe street from River Drive to Midland Avenue including the installation and/or replacement of curbs, sidewalks, driveways, ADA curb ramps, curb pieces, and other incidentals. The project also includes the removal of existing railroad tracks on Monroe Street. Midland Avenue: Replacement of curbs and sidewalks on Midland Avenue from Outwater Lane to Elizabeth Street. The project also includes installation and/or replacement of driveways, ADA curb ramps, bicycle safe grates, curb pieces, and other incidentals. Principal items of work in the project include: · 1,565 TON Hot Mix Asphalt 12.5M64 Surface Course · 1,990 S.Y. Concrete Sidewalk, 4" Thick · 4,270 L.F. 9" x 18" Concrete Vertical Curb The work contemplated under this Contract shall be completed within 60 days of authorization to proceed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents