Similar Projects
SCADA Building for the Old Tar Gate Station Site
New Construction, Infrastructure
Design
$300,000 CJ est. value
Greenville, NC 27858

Wildwood Park Bridges & Boardwalks
Infrastructure
Bidding
$300,000 CJ est. value
Greenville, NC 27834

Davila & Velazquez Dental Office / Greenville
New Construction, Infrastructure - 10,807 SF
Bidding
$3,000,000 CJ est. value
Greenville, NC 27858

Multiple High Pressure Natural Gas Facilities - Site Improvements
Infrastructure
Post-Bid
Greenville, NC

Royal Farms #474
New Construction - 11,682 SF
Post-Bid
Greenville, NC 27858

Taxiway A North Rehabilitation
Infrastructure
Results
$3,927,793 CJ est. value
Greenville, NC 27834

Wastewater Treatment Plant (WWTP) Berm Improvement
Infrastructure
Results
$1,001,876 CJ est. value
Grifton, NC 28530

Site Work and Renovations for the Pitt County Animal Shelter
Renovation
Construction
Greenville, NC 27858

Travel Camp RV Facility
New Construction - 12,109 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Greenville, NC 27858

Dickinson Avenue Apartment Complex
New Construction, Infrastructure
Pending Verification
$57,000,000 CJ est. value
Greenville, NC 27834

Eastern North Carolina Behavioral Health Hospital
New Construction, Infrastructure
Pending Verification
$65,000,000 CJ est. value
Greenville, NC 27858

TAP Ada Compliant Curb Ramps
Infrastructure
Bidding
$500,000 CJ est. value
Winterville, NC 28590

Sheetz #397R
New Construction, Demolition - 6,077 SF
Post-Bid
Greenville, NC 27858

Grading, Drainage, Paving, and Structure
Infrastructure
Results
$11,095,483 CJ est. value
Greenville, NC 27834

Sheetz #488 - Diesel Fuel Parking Lot Addition
Addition - 56,379 SF
Construction
$125,000 est. value
Greenville, NC 27834

Reported 08/20/2022 12:00 AM
Project Title

Cars & Beyond New Building

Physical Address View project details and contacts
City, State (County) Greenville, NC 27834   (Pitt County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Bidding, Construction Start Expected 2022,
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the new construction of a car dealership building.

Details

Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Fences and Gates, Screening Devices, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents