Similar Projects
Heat Pump Replacement Project
Renovation
Sub-Bidding
$475,000 CJ est. value
Biddeford, ME 04005

HVAC Improvements - Androscoggin County Courthouse and Jail Facilities Project
Renovation
Sub-Bidding
$300,000 CJ est. value
Auburn, ME 04210

N3904021q0342- HVAC System Maintenance Portsmouth Naval Shipyard
Term Contract
Post-Bid
Kittery, ME 03904

Heat Pump Installation - Presque Isle Me
Term Contract
Post-Bid
Presque Isle, ME 04769

Vent Duct
Results
Kittery, ME 03904

Franklin Deficiency List Repairs
Term Contract
Results
$100,000 to $250,000 est. value
Franklin, ME 04634

Bramhall Fire Station Boiler Replacement
Renovation
Sub-Bidding
$140,000 CJ est. value
Portland, ME 04102

HVAC Contract Services
Alteration
Post-Bid
Brunswick, ME

Holden Elementary School Indoor Air Quality Improvements Project
Alteration
Results
Holden, ME 04429

Air Handler Replacement
Renovation
Sub-Bidding
$500,000 CJ est. value
Augusta, ME 04330

Chiller Replacement for Riverview Psychiatric Center
Alteration
Post-Bid
$700,000 est. value
Augusta, ME 04330

Repairs on The 2nd Floor Classrooms HVAC Fan Coil Units in Auburn, ME
Term Contract
Results
Auburn, ME 04210

Heat Pump Installation and Solar Power Purchase
Renovation
Sub-Bidding
$250,000 CJ est. value
Lamoine, ME 04605

NMCC Christie HVAC Renovation
Alteration
Post-Bid
$650,000 to $750,000 est. value
Presque Isle, ME 04769

UM DP Corbett HVAC Renovation
Alteration
Results
Orono, ME

Last Updated 01/24/2023 09:09 AM
Project Title

University of Maine at Augusta Handley Hall HVAC Improvements

Physical Address View project details and contacts
City, State (County) Augusta, ME 04330   (Kennebec County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status All Sub-Bids Received, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $570,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of removal of the existing air handling units above the restrooms of the second, third, and fourth floors and their associated condensing units on the roof and all associated refrigeration piping, controls, supply/return ductwork, reheat coils. Demolition work will also consist of removing all abandoned steam pipes, coils, and accessories, as well as all other abandoned mechanical equipment above the existing restrooms on the second, third, and fourth floors. On the lower level, demolition shall include the relocation of two existing radiant heating panels and all associated piping and accessories. This project will also involve the installation of new Energy Recovery Units (ERU) and VRF heat pump systems to serve the second floor through the fourth floors. The work shall include all architectural and electrical work required to facilitate the work. The main electrical room will also be renovated to provide the required fire ratings and clearances. Fire rated doors shall be provided to mechanical and storage spaces requiring such doors.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents