Similar Projects
I-15; Black Ridge to Iron County Rehabilitation High Volume
Bidding
$10,000,000 to $15,000,000 est. value

Merrill Road Project 2019
Post-Bid
Washington, UT

Santa Clara Truman Drive Landslide Project
Post-Bid
Santa Clara, UT 84765

DFCM Construction-Pre Qualification for General/Mechanical/Electrical/Roofing/Paving Contractors
Results
$3,500,000 est. value

Specialized Precast Concrete Box Culvert
Results

UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

Construction of The Virgin River Stream Restoration Project
Results
Less than $1,116,310 est. value
Washington, UT

2020 Spring Pavement Maintenance
Post-Bid
Ivins, UT 84738

I-15; Exit 16 Interchange Improvements Phase 1
Results
$20,000,000 to $30,000,000 est. value
UT

Drainage Improvements and Pavement Maintenance Project
Post-Bid
Saint George, UT 84770

Construction of the Pioneer Park Loop Road
Results
Less than $175,437 est. value
Saint George, UT 84790

Bloomington Hills Drive Roadway Widening
Post-Bid
Saint George, UT 84770

2019 Slurry Seal Project
Results
Hurricane, UT

SR-228; Leeds Main Street
Results
$500,000 to $1,500,000 est. value
UT

Construction of the Zion Shadows and Red Hawk Improvements
Results
Springdale, UT 84767

Last Updated 09/02/2019 07:36 PM
Project Title

Virgin River South Trail Repairs Bloomington Park to Las Colinas Park

Physical Address View project details and contacts
City, State (County) Saint George, UT 84790   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $323,188
Plans Available from Municipal Agency - 07/15/19
Owner View project details and contacts
Architect View project details and contacts
Description Sediment removal, demolition and removal of soil cement trail, installation of storm drain lines, catch basin, rock rip-rap, gabion basket erosion protection, replacement of concrete trail, asphalt trail with geotextile and tack coat, and striping.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents