Similar Projects
South Water Treatment Plant Silos Rehabilitation - Lafayette
Renovation
Conception
$300,000 CJ est. value
Lafayette, LA 70506

East Sewage Treatment Plant Sludge Dryer - City of Lafayette
Renovation
Conception
$6,250,000 CJ est. value
Lafayette, LA 70501

South Wastewater Treatment Plant Digester Rehabilitation
Renovation
Bidding
$399,397 CJ est. value
Lafayette, LA 70503

Water Treatment Plant Improvements Phase I
Infrastructure
Bidding
$5,000,000 CJ est. value
Morgan City, LA 70380

Improvements to the Amiss Water Treatment Intake Structure
Renovation
Post-Bid
$250,000 CJ est. value
Shreveport, LA 71103

Water Treatment Plants Miscellaneous Building Repairs
Renovation
Post-Bid
$424,320 CJ est. value
Lake Charles, LA 70601

Wastewater Treatment
Renovation
Results
$350,000 est. value
Saint Gabriel, LA 70776

Sewer Plant Renovations
Renovation
Results
$56,500 est. value
Jennings, LA

Treatment Plant Expansion And Renovation - City of Monroe
Addition, Demolition, Renovation, Infrastructure
Conception
$45,000,000 CJ est. value
Monroe, LA 71203

Rehab of Treatment Units at North Water Treatment Plant
Infrastructure
Bidding
$400,000 CJ est. value
Lafayette, LA 70501

Complete Replacement of Chlorination and Dechlorination Systems and Building at the Wastewater Plant
Renovation
Post-Bid
$765,000 CJ est. value
Jennings, LA 70546

South Wastewater Treatment Plant Solids Handling Upgrade
Renovation
Results
$4,750,000 CJ est. value
Baton Rouge, LA 70820

North Water Treatment Plant Building Improvements - Lafayette Consolidated Government
Renovation
Conception
$2,000,000 CJ est. value
Lafayette, LA 70501

East WWTP Anaerobic Digester Rehabilitation
Infrastructure
Bidding
$8,402,300 CJ est. value
Lafayette, LA 70501

Wastewater Sludge Hauling and Disposal Services
Term Contract
Post-Bid
Kenner, LA 70065

Last Updated 10/16/2023 01:02 PM
Project Title

North Water Treatment Plant Emergency Generator

Physical Address View project details and contacts
City, State (County) Lafayette, LA 70501   (Lafayette County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $205,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the furnish and installation of an emergency generator and fuel tank, foundation and all other associated work. All work will be completed with 365 calendar days from the issuance of Notice to Proceed. Each bid shall be accompanied by a certified check, cashier's check, or bid bond payable to the Lafayette Consolidated Government, the amount of which shall be five percent (5%) of the base bid plus additive alternates. If a bid bond is used, it shall be written by a surety or insurance company currently on the U.S. Department of the Treasury Financial Management Service list of approved bonding companies which is published annually in the Federal Register, or by a Louisiana domiciled insurance company with at least an A-Rating in the latest printing of the A.M. Best's Key Rating Guide to write individual bonds up to ten percent (10%) of policyholders' surplus as shown in the A.M. Best's Key Rating Guide, or by an insurance company in good standing licensed to write bid bonds which is either domiciled in Louisiana or owned by Louisiana residents. The bid bond shall be issued by a company licensed to do business in Louisiana. The certified check, cashier's check, or bid bond shall be given as a guarantee that the bidder shall execute the contract, should it be awarded to him, in conformity with the contract documents within ten (10) days. No contractors may withdraw his bid for at least forty-five (45) days after the time scheduled for the opening of bids. Each bid shall be submitted only on the bid form provided with the specifications. The successful contractor will be required to execute performance and labor and material payment bonds in the full amount of the contract as more fully defined in the bid documents. Contractors shall be licensed for the classification of "Municipal and Public Works Construction" or "Electrical". Bids in the amounts specified above which have not bid in accordance with the requirements, shall be rejected and shall not be read. Additional information relative to licensing may be obtained from the Louisiana State Licensing Board for Contractors, Baton Rouge, Louisiana. The Lafayette Consolidated Government strongly encourages the participation of DBEs (Disadvantaged Business Enterprises) in all contracts or procurements let by the Lafayette Consolidated Government for goods and services and labor and material. To that end, all contractors and suppliers are encouraged to utilize DBEs business enterprises in the purchase or sub-contracting of materials, supplies, services and labor and material in which disadvantaged businesses are available. Assistance in identifying said businesses may be obtained by calling 291-8410. PURCHASING DIVISION Lafayette Consolidated Government

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents