Similar Projects
J012--Fire and Smoke Damper Repairs Services
Term Contract
Bidding
Boston, MA 02132

Fire Alarm Control Panel Upgrade at 52-56 Chauncy Street
Post-Bid
Less than $69,177 est. value
Boston, MA

Fire Extinguisher Maintenance Services Authority Wide
Post-Bid
Boston, MA 02128

Existing Sprinkler System and Fire Pump
Term Contract
Results
$33,174 est. value
Boston, MA

Electrical/Fire Alarm at J.F. Condon and Warren-Prescott Schools - General Bids
Results
Boston, MA

Fire Alarm Maintenance, Service and Repair
Term Contract
Post-Bid
Less than $5,000,000 est. value
Boston, MA 02116

Fire Alarm/Sprinkler System Inspection, Testing, Maintenance and Repair
Results
Boston, MA 02129

Inspection, Testing, Maintenance of Fire Preventive Systems
Post-Bid

Curley Community Center Renovation - Sub-Bids
Results
Less than $21,900,000 est. value
Boston, MA

Fire Alarm Cabinets and Parts
Post-Bid
Boston, MA

Fire Alarm and Fire Protection Maintenance Services
Term Contract
Results
Less than $129,521 est. value
Chelsea, MA 02150

Fire Alarm, Master Box Upgrade
Post-Bid
Boston, MA

USCG Base Boston Fire Pump Replacement
Results
$25,000 to $50,000 est. value
Boston, MA

Fire Alarm Control Panel Replacement at Eva White Development
Post-Bid
Less than $48,000 est. value
Boston, MA 02116

Fire Alarm Testing and Maintenance
Term Contract
Results
$150,000 est. value
Boston, MA

Reported 12/08/2021 04:26 PM
Project Title

Moakley Fire Alarm System Project

Physical Address View project details and contacts
City, State (County) Boston, MA 02210   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

BACKGROUND: The John Joseph Moakley United States Courthouse, (Moakley Federal Courthouse), is a ten story masonry building containing 945,000 gross square feet located on the Boston Harbor. The ten story facade features a conical 32,736 square foot glass curtain wall system that overlooks Boston Harbor and offers one of the best views of Boston's skyline. The building was completed in 1999 at a cost of $170 million and is not designated as historic. It has won numerous design awards. The existing fire alarm system is a Siemens System and is located in the First Floor Fire Command Room. PROJECT GOAL: To replace the existing fire alarm system that has come to the end of its life cycle with a non-proprietary system. The new fire alarm system is to be a voice evacuation-type system that meets the GSA specifications, technical guides, and the PBS P-100. New fire alarm system is to be a non-proprietary system which will be economical to operate and maintain. Fire alarm shall remain operational and no components shall be removed until the fire alarm system is tested, approved and accepted. The scope of the project includes complete design of a full fire alarm system replacement and the phase 1 construction. PROJECT SCOPE: The project includes but is not limited to the following work: Provide Design-Build services for designing and installing a new fire alarm and emergency communications system throughout the building. Work will include removal of the existing fire alarm system (e.g., unused wiring, alarm devices, communications devices, and main control panels) and patching and painting areas where components have been removed. The biddable scope is being put together by BBIX, LLC under their related Task Order (TO). Project will be to provide Fire Alarm (FA) replacement design and complete phase 1 replacement. Building will be fully occupied and the FA system will remain active during the construction. The contractor will be responsible for a complete design for the project, including calculations, specifications, and drawings needed to perform the required modifications to the fire alarm and emergency communications system. The contractor will be responsible for the installation of all work and shall provide all material, equipment, accessories, commissioning and testing in compliance with the design documents.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents