Similar Projects
Telecommunications Tower
New Construction
Design
Sutherland, VA 23885

Telecommunications Tower
New Construction
Design
Cave Spring, VA 24018

USMS TOD Tower Upgrade
Bidding
Arlington, VA

Design/Build Pentagon Control Tower and Day Station - PHASE II
New Construction
Post-Bid
$10,000,000 to $25,000,000 est. value
Arlington, VA

ACRx Node Tower and Building Rooftop Antenna Installation Services (IDIQ) Contract
Post-Bid

Franklin (FKN) VOR/BUEC, Franklin, VA Remote Transmitter/Receiver Replace Project
Results
$100,000 to $250,000 est. value
Franklin, VA

Massanutten Peak Tower Repair
Results
VA

Telecommunications Tower
New Construction
Design
Charlottesville, VA

X005 Wind Cone Removal and Install
Post-Bid
Less than $25,000 est. value
Quantico, VA 22134

Radio Tower Maintenance
Results
Chesapeake, VA 23328

Telecommunications Tower
New Construction
Design
Manakin, VA 23103

CEC Tower Install
Post-Bid
VA

Provide and Install Rotating Beacon and Tower
Results
Chesapeake, VA 23321

Telecommunications Tower
New Construction
Design
Gladys, VA

Chiller Plant and Control System Mod FAA Air Traffic Control System Command Center Warrenton, VA
Post-Bid
$6,000,000 to $8,000,000 est. value
Warrenton, VA 20187

Reported 03/06/2021 12:00 AM
Project Title

Repair Building Envelope and Interior Infrastructure Control Tower at Facility 381

Physical Address View project details and contacts
City, State (County) Hampton, VA 23665   (Hampton City County)
Category(s) Tower/Signal System
Sub-Category(s) Tower/Signal System
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Task Order - MUHJ 17-4069 for Repair Building Envelope and Interior Infrastructure Control Tower, Facility 381: project is to inspect and survey the current exterior insulation stucco system, windows, roof, HVAC and electrical systems, and interior finishes of the Control Tower (Facility. 381), and provide a design (to include (but not limited to) modifying, or replacing the exterior insulation and finish system, windows, roof system, HVAC and faulty electrical system components to eliminate moisture penetration and associated moisture damage to the interior finishes and prevent unscheduled power outages that have been occurring on 2nd thru 4th floors. During the course of the project, shower rooms were added to the project, drainage improvements around the base of the tower, an entry vestibule, and provision of a new power feed both to the tower and to Bldg. 376, which had originally been sub-fed from the Control Tower. The design and repair efforts shall be in accordance and compliance with all latest UFCs, ETL, and Air Force Standards.

Details

Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical.
Division 31 - Earthwork, Site Clearing.
Division 33 - Utilities, Site Grounding, Site Improvements Grounding, Tower Grounding, Site Lightning Protection, Communications Utilities, Communications Structures, Communications Transmission Towers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents