Similar Projects
Alexander City Retail Development
New Construction, Infrastructure - 68,291 SF
Design
$18,000,000 CJ est. value
Alexander City, AL 35010

Alexander City Retail Development
New Construction, Infrastructure - 68,291 SF
Design
$18,000,000 CJ est. value
Alexander City, AL 35010

Downtown Square Streetscape Improvements
Infrastructure
Bidding
$1,200,000 CJ est. value
Tallassee, AL 36078

Downtown Square Streetscape Improvements
Infrastructure
Bidding
$1,200,000 CJ est. value
Tallassee, AL 36078

Annual Paving
Infrastructure
Post-Bid
AL

Micro Surfacing
Infrastructure
Post-Bid
AL

Downtown Utility Relocation
Infrastructure
Results
est. value
Tallassee, AL

Constructing the Widening, Resurfacing, and Traffic Stripe on Camp Grandview Road
Infrastructure
Results
$484,475 to $592,136 est. value
AL

Diamond Oaks - Phase 2: Sewer Manhole Rehabilitation Project
Infrastructure
Construction
$910,405 CJ est. value
Millbrook, AL 36054

Diamond Oaks - Phase 2: Sewer Manhole Rehabilitation Project
Infrastructure
Construction
$910,405 CJ est. value
Millbrook, AL 36054

Water Meter Replacement and AMRS
Infrastructure
Bidding
$200,000 CJ est. value
Dadeville, AL 36853

Milling
Infrastructure
Post-Bid
AL

Constructing the Widening, Planning, Resurfacing, and Traffic Stripe on Jasmine Hill Road
Infrastructure
Results
$1,027,749 to $1,256,137 est. value
AL

2022 Rebuild Alabama Paving
Infrastructure
Post-Bid
AL

Constructing the Safety Widening, Micro-milling, Resurfacing, Bridge Guardrail Retrofit, and Traffic Stripe on SR-49 From the Junction of SR-38 (US-280)
New Construction, Infrastructure
Results
$2,343,120 to $2,863,813 est. value
AL

Last Updated 11/22/2022 07:12 AM
Project Title

Bridge Rehabilitation and Bridge Painting on SR-14

Physical Address View project details and contacts
City, State (County) Tallassee, AL 36078   (Elmore County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $3,496,667 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties : Elmore and Tallapoosa Constructing the Bridge Rehabilitation and Bridge Painting on SR-14 over the Tallapoosa River in Tallassee. Length 0.329 mi. The Bracket Estimate on this project is from $4,620,367 to $5,647,116 . Contract Time: 230 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 001 - Bridge Rehabilitation and Bridge Painting on SR-14 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (29.9%), WBE (6.9%) PSSP No. 22-PS0091, BIN(S)- 002550

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents