96-inch Main Relocation, Isolation Valves Installations, and New Parallel Main - 122004 - Great Lakes Water Authority
Infrastructure
Conception
$116,168,000 CJ est. value
North Lakeport, MI 48059

96-inch Main Relocation, Isolation Valves Installations, and New Parallel Main - 122004 - Great Lakes Water Authority
Infrastructure
Conception
$116,168,000 CJ est. value
North Lakeport, MI 48059

Cawood Honda
Addition, Infrastructure - 3,485 SF
Design
$920,040 CJ est. value
Port Huron, MI 48060

Grove Avenue Mixed-Use / Port Huron
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Port Huron, MI 48060

Marysville Water Filtration Plant Chemical Containment Room Improvements
Renovation
Bidding
$240,000 CJ est. value
Marysville, MI 48040

High School Sitework project
Infrastructure
Bidding
Casco, MI 48064

Anchor Bay High School - Sitework
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Ira, MI 48023

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Buckland Industries
Infrastructure
Post-Bid
$3,927,000 est. value
Port Huron, MI 48060

Play Area Install and Site Improvements at Goodells County Park
Renovation
Results
Goodells, MI 48027

Connecticut Avenue Water Main Replacement 15th Street to 18th Street
Infrastructure
Results
Marysville, MI 48040

Desmond Landing
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Port Huron, MI 48060

Economic Development Alliance of St. Clair County New Office Building
Demolition, New Construction, Infrastructure - 14,000 SF
Pending Verification
$4,000,000 CJ est. value
Port Huron, MI 48060

Lake Huron Water Treatment Plant, Low-Lift, High Lift and Filter Backwash Pumping System Improvements - 111001 - Great Lakes Water Authority
Renovation
Conception
$487,750,000 CJ est. value
Avoca, MI 48006

Marine City Storage Cold Storage Phase 3
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Marine City, MI 48039

Last Updated 07/03/2023 02:38 PM
Project Title

Water Treatment Plant and Water Main Improvements

Physical Address View project details and contacts
City, State (County) Saint Clair, MI 48079   (Saint Clair County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $19,789,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes the following major items: 1. Restoration of concrete walls, floors, and ceilings at existing water treatment plant. 2. Abatement of hazardous building materials. 3. Installation of approximately 1,400 LF of water main located east of the intersection of Jordan Creek Dr. and Christian B. Hass Dr. in St. Clair, Michigan. 4. Shorewell Pumping Station building addition including sodium hypochlorite chemical feed system and natural gas standby generator. 5. New low service pumps and VFDs at the Shorewell Pumping Station. 6. Installation of mechanical inline rapid mixers. 7. Construction of a new pretreatment system basin. 8. Installation of new pretreatment system improvements including flocculation, high-rate sedimentation, and sludge collection equipment. Equipment to be installed in two existing and one new pretreatment basin. 9. Construction of a new gravity filter. 10. Installation of gravity filter system improvements including filter underdrains, filter media, filter valve actuators, filter wash water troughs (Filter 4 only), filter control consoles, and air scour system. Equipment to be installed in three existing and one new gravity filter. 11. Three new filter transfer pumps. 12. Construction of secondary backwash piping system. 13. New high service pump discharge control valves and piping. 14. Associated process piping and valves. 15. Chemical feed system improvements including storage tanks, metering pumps, and feed piping and appurtenances. 16. New air handling unit and related heating, ventilating, and air conditioning (HVAC) piping and equipment. 17. Miscellaneous plumbing improvements. 18. New LED lighting, emergency lighting, and receptacles at the Water Treatment Plant and Shorewell Pumping Station. 19. New standby diesel generator at the water treatment plant which includes fuel storage and piping. 20. New service entrance rated automatic transfer switch and motor control centers at the Water Treatment Plant and Shorewell Pumping Station. 21. Replacement of existing flow meters and other new instrumentation system components to support new equipment and processes. 22. New PLC and SCADA system to support water treatment equipment/processes.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents