Similar Projects
DSS Building - Chiller Replacement Phase 2
Post-Bid
Fayetteville, NC 28301

College Lakes Elementary Kitchen A/C
Post-Bid
Fayetteville, NC 28311

Hope Mills and South View Middle School Gymnasium HVAC Renovation Project
Results
Hope Mills, NC 28348

HVAC Maintenance Contract
Term Contract
Results
Less than $713,590 est. value
Dunn, Erwin, Lillington, Spring Lake, NC 27546

Hope Mills Middle Auditorium Compressor Replacement
Post-Bid
Hope Mills, NC 28348

Pine Forest Middle School Gym HVAC Addition
Results
Less than $168,000 est. value
Fayetteville, NC 28311

Crown Coliseum Cooling Tower Replacement
Post-Bid
Fayetteville, NC 28302

Westover High School HVAC Infrastructure Phase II
Results
Fayetteville, NC 28303

Removal of Thirty-Two (32) R-22 10 Seer Air Handlers in 32 Occupied Apartment Units
Post-Bid
Fayetteville, NC 28301

Job Order Contract for HVAC Installation and Repair
Term Contract
Results
Fayetteville, NC 28302

SPLFRC Packaged Unit Replacement
Post-Bid
Spring Lake, NC 28390

Hope Mills Middle Locker Room HVAC Addition
Results
Less than $17,333 est. value
Hope Mills, NC 28348

Welding-Lawn Equipment Repair Shop A/C Replacement
Post-Bid
Fayetteville, NC 28306

Pine Forest Middle School Building 3 HVAC Renovation
Results
Fayetteville, NC 28311

Phase 2 Classroom HVAC Upgrade at South View Middle School
Post-Bid
Less than $500,000 est. value
Hope Mills, NC 28348

Reported 09/19/2020 12:00 AM
Project Title

Spring Lake Chiller Replacement

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28302   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this project consists of providing all labor, equipment, and materials necessary for the replacement of the chiller at the Spring Lake Library. Scope of work includes providing: 1. Demolition and removal of existing Carrier chiller 2. Disconnect existing electrical 3. Re-use existing concrete pad 4. Provide and install 30 Ton chiller 5. Reconnect electrical 6. Provide insulation and heat tracing systems on all new pipe and equipment to match existing 7. Tie into existing controls. 8. Provide operation and maintenance manuals for new chiller.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents