Similar Projects
US 51 - Utilities
Infrastructure
Conception
$1,030,000 CJ est. value
Hennessey, OK 73742

US 51 - Utilities
Infrastructure
Conception
$1,030,000 CJ est. value
Hennessey, OK 73742

Utilities - US 81
Infrastructure
Design
$1,000,000 CJ est. value
Dover, OK 73734

Utilities - US 81
Infrastructure
Design
$1,000,000 CJ est. value
Dover, OK 73734

REAP 2023 Waterline Replacement
Renovation
Bidding
$413,000 CJ est. value
Hennessey, OK 73742

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

2022 CDBG Drainage Improvements
Infrastructure
Results
$599,525 CJ est. value
Hennessey, OK 73742

2022 CDBG Drainage Improvements
Infrastructure
Results
$599,525 CJ est. value
Hennessey, OK 73742

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Widen and Resurface - SH 33
Infrastructure
Design
$12,360,000 CJ est. value
Kingfisher, OK 73750

Health Department Drive Through and Storage buildings
New Construction, Infrastructure
Post-Bid
$350,000 CJ est. value
Kingfisher, OK 73750

Widen and Resurface - SH 33
Infrastructure
Design
$6,180,000 CJ est. value
Kingfisher, OK 73750

AG Barn Addition-Locker Room Building-Concessions Building Renovation
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Kingfisher, OK 73750

Last Updated 04/06/2023 07:01 AM
Project Title

Utilities - SH 3

Physical Address View project details and contacts
City, State (County) Kingfisher, OK 73750   (Kingfisher County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected February 2025
Bids Due View project details and contacts
Estimated Value $530,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-3: From the Kingfisher County Line, Extend East 8 Miles to 1 Mile West of .kingfisher (Ut for 04) As of April 06, 2023, the project is in Design status. Anticipated letting month/year is July, 2024. Length : 8.000 Mi OKDOT - Utilities - SH 3 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents