Similar Projects
HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Bidding

Installation of a HVAC Water Treatment System
Alteration
Bidding
East Windsor, NJ 08520

IT Room Cooling
Post-Bid
$952,202 est. value
Ewing, NJ 08625

PPPL D-Site HVAC Upgrades
Post-Bid
$4,000,000 to $6,000,000 est. value
Princeton, NJ 08543

Duct Cleaning for the County of Mercer and the Mercer County Park Commission
Term Contract
Results
Trenton, NJ 08611

Centennial Hall Partial Room Air-Conditioning Project
Results
Ewing, NJ 08628

New Ventilation System
Alteration
Bidding
$103,421 est. value
Ewing Township, NJ 08628

Request For HVAC Proposals - Rescue Mission of Trenton
Post-Bid
Trenton, NJ 08609

Culinary Walk-In Box for the Arthur R. Sypek Campus
Results
Pennington, NJ

Vacant Unit Reconditioning
Post-Bid
Trenton, NJ 08638

Temporary Chiller Installation
Results
$169,074 est. value
Hamilton, NJ 08691

RFQ - HVAC Contractors
Post-Bid
Trenton, NJ

HVAC Upgrade at OT/PT Classroom - Maurice Hawk Elementary School
Results
Less than $110,000 est. value
Princeton Junction, NJ 08550

HVAC and Mechanical Products
Term Contract
Post-Bid

Residence Halls HVAC Cleaning
Results
Ewing, NJ 08628

Last Updated 09/13/2021 03:17 PM
Project Title

HVAC Evaluation

Physical Address View project details and contacts
City, State (County) Ewing Township, NJ 08618   (Mercer County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

P003 HVAC Engineering This project primarily involves the Main Office Building and Engineering & Operations Building at New Jersey Department of Transportation Headquarters in Ewing, NJ. The objective is to evaluate the indoor thermal environment and indoor air quality of the aforementioned buildings as well as the associated systems that serve them. The final deliverables shall include an oral presentation and a written report containing a recommended scope of work, construction cost estimate, and preliminary schematics for a new design.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents