Similar Projects
Region 4 Northern AML Maintenance West Virginia
Alteration
Bidding
Charleston, WV

Region 1 Northern AML Maintenance West Virginia
Term Contract
Bidding

Williamson (Hight) Drainage and Portals
Infrastructure
Post-Bid
Charleston, WV

Drain Replacement in the Student Center Ram's Den
Infrastructure
Post-Bid
Shepherdstown, WV

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Construction of and Repairs to the Meadow River Rail Trail
Infrastructure
Bidding
Lewisburg, WV

Stormwater Pond 1 Diversion Project
Infrastructure
Post-Bid
Martinsburg, WV

Pike Island Monolith R33 and RR34 River Wall Crack Stabilization 2020
Results
$500,000 to $1,000,000 est. value
Wheeling, WV 26003

Repair a Sinkhole
Infrastructure
Bidding
Madison, WV

Meadow River Trail FEMA Remediation Project
New Construction, Infrastructure
Post-Bid
Lewisburg, WV

Oak Grove Extension Drainage
Results
WV

Install a French Drain
Infrastructure
Bidding
Madison, WV

Summersville Battle Run Waterline
Infrastructure
Post-Bid
$100,000 to $250,000 est. value
Summersville, WV 26651

Pioneer Trail Retaining Wall Site 5
Results
WV

Last Updated 02/08/2022 03:50 PM
Project Title

Carl Mine Complex

Physical Address View project details and contacts
City, State (County) (Greenbrier, Nicholas Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project consists of providing sediment and erosion control as shown on the plans, regrading refuse, soil cover, mine seal installation, structure demolition, revegetating all disturbed areas, and final site cleanup. The Contractor shall perform all operations necessary for: • Providing sediment and erosion control as shown on the plans • Regrading refuse • Soil cover • Mine seal installation • Structure demolition • Revegetate all disturbed areas • Final site cleanup. This item shall consist of furnishing all materials, equipment, labor and incidentals necessary for the installation of Sediment Control Barrier (e.g. woven belted silt fence) structures, and Stabilized Construction Entrances as designated in the Drawings. Sediment control shall be placed on regraded out slope areas concurrent with construction and prior to revegetation. Additional quantities may be added at the discretion of the WVDEP.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents