Last Updated 01/29/2019 08:51 AM
Project Title

Alamogordo Flood Control Project, Mckinley Channel, Phase VIII, Otero County, New Mexico

Physical Address View project details and contacts
City, State (County) Alamogordo, NM 88310   (Otero County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The proposed project consists of approximately 8100 linear feet of reinforced concrete lined channel or concrete box culvert for the existing McKinley ditch. The project begins at the intersection of McKinley Ditch and First Street and proceeds upstream for 8100 feet terminating with a proposed debris catch basin which includes a reinforced concrete spillway with backslopes lined with riprap slope protection. Along the way, the channel configuration includes trapezoidal, rectangular with transitions for changes in configuration. The channel includes splitter walls and access ramps. The project construction also includes utility relocations. The purpose of the McKinley Channel is to route flood flows from McKinley Canyon through the developed areas of the City of Alamogordo. This is an active channel within residential areas and associated confined work spaces. In addition, the contract includes the necessary utility relocation needed for the construction of the channel and all necessary support.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents