Similar Projects
Holt Fire Station
New Construction
Conception
$813,000 est. value
Holt, FL

Longwood Fire Station 15/Public Safety Facility
New Construction
Conception
Longwood, FL

New Police Facility
New Construction
Design
Tallahassee, FL

Fire Station 11
New Construction
Design
Orlando, FL

Fire Station No. 2
New Construction - 87,619 SF
Bidding
Fernandina Beach, FL 32034

Construction Manager at Risk for County Fire and Emergency Medical Stations
New Construction
Bidding
$12,000,000 est. value
Alachua, Gainesville, FL 32607

Cocoa Beach Police Headquarters
New Construction - 28,900 SF
Post-Bid
Less than $8,500,000 est. value
Cocoa Beach, FL

Town of Windermere Town Facilities
New Construction - 9,882 SF
Post-Bid
$5,200,000 est. value
Windermere, FL

Consultant Services for a New Police Headquarters
New Construction - 225,000 SF
Results
Fort Lauderdale, FL 33301

Construction Manager at Risk for the Austin Tindall Fire Station
Results
Kissimmee, FL 34741

Replace Fire Crash Rescue Station, 125th Fighter Wing, Jacksonville, FL
New Construction - 17,400 SF
Construction
$5,000,000 to $10,000,000 est. value
Jacksonville, FL 32218

Venice Fire Station 1 and City Hall Expansion
Construction
Less than $5,000,000 est. value
Venice, FL 34285

Fire Station 17 and Community Resilience Center
New Construction
Conception
Tallahassee, FL 32310

Orlando Fire Station 6
New Construction
Design
Orlando, FL

Orange County Fire Station 44 Replacement
Renovation
Bidding
$4,750,000 est. value
Orlando, FL 32885

Reported 11/03/2021 12:00 AM
Project Title

Tyndall AFB Fire Station

Physical Address View project details and contacts
City, State (County) Tyndall AFB, FL   (Bay County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

BID ITEM NO. 1: 1. CONSTRUCTION OF FIRE STATION #4 FACILITY Payment under Bid Item No. 1 "Construction of Fire Station #4 Facility" shall constitute full compensation for furnishing and installation of all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction of the new facility in accordance with the design-build Request for Proposal (RFP) solicitation documents, criteria, requirements and criteria drawings to a point 5 feet outside the building lines. This line item shall include applicable power and pathway infrastructure for equipment, such as the audio-visual equipment, gunshot detection system and other applicable systems. BID ITEM NO. 2: 2. CONSTRUCTION OF SUPPORTING SITEWORK FOR FIRE STATION #4 FACILITY Payment under Bid Item No. 2 "Construction of Supporting Sitework for Fire Station #4 Facility" shall constitute full compensation for furnishing and installation of all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction of the work beyond the 5 foot building lines of the facility in accordance with the design-build Request for Proposal (RFP) solicitation documents, criteria, requirements and criteria drawings including but not limited to; clearing, grubbing, and grading the site, demolition of existing site improvements and utilities, site improvements, hauling spreading and disposal of any cut or fill material, the installation of all exterior utilities, sidewalks and pavements, stormwater structures and management facilities, and landscaping. The design-build Contractor shall be responsible for saw cutting and patching of pavements, sidewalks and restoration of any damaged landscaping related to the utility systems installation or demolition as part of the Base Bid costs. BID ITEM NO. 3: 3. DESIGN OF FIRE STATION #4 FACILITY AND SUPPORTING SITEWORK Payment under Bid Item No. 3 "Design of Fire Station #4 Facility and Supporting Sitework” shall constitute full compensation for furnishing all materials, plant, tools, labor costs, testing, expenses, and other associated incidentals associated with the design and preparation of design review documents, permitting with related fees and documents, and construction documents for the facility and supporting sitework for base bid and all bid options including, but not limited to following design and engineering; architectural, interior design, audio-visual design, civil, site environmental remediation design, landscape design, structural, mechanical, fire protection, electrical, cathodic protection, and communications/security systems, applicable Facility Related Controls Systems, including Gunshot Detection, all performed in accordance with design-build Request for Proposal (RFP) solicitation documents, criteria, and requirements. This JOB fee shall include all meetings and reports required during the design phase, construction phase involvement by the designers of record and their supporting team members, as well as surveying and geotechnical investigations and reports. BID OPTIONS BID ITEM NO. 4 (BID OPTION NO. 1) 4. PROCUREMENT AND INSTALLATION OF FURNITURE, FIXTURES AND EQUIPMENT (FF&E) FOR FIRE STATION #4 FACILITY Payment under Bid Item No. 4 “Bid Option No. 1 Procurement and Installation of Furniture, Fixtures & Equipment (FF&E) for Fire Station #4 Facility” shall constitute full compensation for the work associated with the procurements and installation of the Furniture, Fixtures & Equipment (FF&E) Package in accordance with requirements of the Request for Proposal (RFP) solicitation documents, criteria, requirements and criteria drawings and the FF&E included in Appendix C of the design-build solicitation. All associated design is to be provided in the Base Bid, Bid Item No. 3. BID ITEM NO. 5 (BID OPTION NO. 2) 5. PROCUREMENT AND INSTALLATION OF AUDIO-VISUAL EQUIPMENT (A/V) FOR FIRE STATION #4 FACILITY Payment under Bid Item No. 5 “Bid Option No. 2 Procurement and Installation of Audio-Visual Equipment (A/V) for Fire Station #4 Facility” shall constitute full compensation for the work associated with the procurements and installation of the Audio Visual Package in accordance with requirements of the Request for Proposal (RFP) solicitation documents, criteria, requirements and criteria drawings and the Audio Visual Package included in Appendix C of the design-build solicitation. All associated design is to be provided in the Base Bid, Bid Item No. 3.

Details

Fire/Police Station, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents