Similar Projects
Last Updated | 09/17/2021 12:43 PM |
Project Title | Administrative Facilities New Asphalt, Pavement, Sidewalks,Concrete Stairs, and New Loading Docks |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI (Milwaukee County) |
Category(s) | Heavy and Highway, Single Trades |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Windows/Doors |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project contemplated consists of removing and replacing the railings throughout the facility. Remove and replace sidewalk that is not ADA compliant. Saw cut and replace both lab docks with heated docks added in. Remove and replace existing overhead dock door, operator, and frame. Remove and replace concrete stairs in the parking lot. Install new inlets. Replace remaining asphalt within the facility and repaint the parking lot spaces, including the handicap spaces. Replace two doors on the northside of the building which are the emergency exit doors for the MMSD Commission room. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |