Last Updated | 12/07/2022 10:06 AM |
Project Title | Rusmor Street Watermain Improvements |
Physical Address | View project details and contacts |
City, State (County) | Orange Park, FL 32073 (Clay County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $339,699 [brand] Estimate |
Plans Available from | Civil Engineer - 09/29/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Rusmor Street Extension Water Main Improvement The Project site is located within utility easements on the south property line of Park Central Plaza, behind the building at 1600 Park Plaza, and between the buildings at Fantastic Floors, then along the north property line of The Seasons on Park Avenue to the master metered connection. The Project limits are utility easements on property within the Town of Orange Park. The major work elements include, but are not limited to, the following: Base Bid: a. Removal of existing Asphalt and Concrete as needed to install new Water Main b. Connect to existing 8" water main at Smith and Rusmor Street with 8"x6" Tapping valve and sleeve C. Install new 6" PVC (DR-18) water main pipeline d. Bacteriological clearance and pressure test new water main e. Reconnect existing customers to new water main f. Replace asphalt and concrete removed during construction g. Re-sod all disturbed areas with like grassing Alternate Bid: a. Removal of existing Asphalt and Concrete as needed to install new Water Main b. Connect to existing 8" water main at Smith and Rusmor Street with 8" Tapping valve and sleeve C. Install new 8" PVC (DR-18) water main pipeline from tap location at Smith Street continuing west to Park Avenue d. Install new 6" PVC (DR-18) water main pipeline from about midway between Smith Street and Park Avenue south to The Seasons on Park Avenue Condominiums water connection. e. Bacteriological Clearance and Pressure test new water Main f. Reconnect existing customers to new water main g. Replace asphalt and concrete removed during construction h. Re-sod all disturbed areas with like grassing Bidders must submit with the Bid, documentation that they have constructed similar type work completed during the past five years with references. Each bidder must include resume and qualifications for their proposed on-site supervision superintendent. Said Superintendent shall have maintained continuous employment with bidder for a minimum of three years. The bidders will be required to submit a Bid Bond equal to 5% of the bid with their Proposal. The successful bidder will be required, upon award, to furnish a 100% Performance and Payment Bond, with a Surety acceptable to Owner. Each bid proposal shall remain binding for at least 90 days after the scheduled bid date. The Owner shall reserve the right to accept or reject any or all bids/proposals, waive minor formalities, and any that are in any way incomplete or irregular. The Owner further reserves the right to reject all bids/proposals and re-advertise, or to reject all bids/proposals without further action and award the bid/proposal that serves the Owner's best interest. Any questions regarding the bid documents shall be in writing and directed to the Engineer of Record, Paul Ina, at email pina@cmtengr.com. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |