Similar Projects
Polyset Expansion
Addition, Infrastructure - 24,500 SF
Conception
$1,250,000 CJ est. value
Mechanicville, NY 12118

Starting Gate Farm & Winery
New Construction, Infrastructure - 15,000 SF
Conception
$5,900,000 CJ est. value
Ballston Spa, NY 12020

Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

Ushers Road Medical Building
New Construction, Infrastructure - 40,000 SF
Design
$5,000,000 CJ est. value
Ballston Lake, NY 12019

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Highway Improvements
Infrastructure
Bidding
$6,500,000 CJ est. value
Saratoga Springs, NY 12866

Tait Lane Reserve
New Construction, Infrastructure - 212,731 SF
Post-Bid
$80,000,000 CJ est. value
Saratoga Springs, NY 12866

Water Distribution Valves and Hydrants
Term Contract
Post-Bid
Halfmoon, NY

Lake Road Water Main Replacement
Infrastructure
Results
Less than $900,000 est. value
Stillwater, NY 12170

Water Distribution Pipe Replacement Project Phase I
Infrastructure
Results
Saratoga Springs, NY

Corinth CSD - Capital Improvements - Contract No. 1 - General Construction
New Construction, Renovation, Infrastructure
Construction
$5,396,000 CJ est. value
Corinth, NY 12822

One-Four-Six Marketplace
New Construction, Infrastructure - 151,000 SF
Pending Verification
$140,000,000 CJ est. value
Halfmoon, NY 12118

Summit At Halfmoon
New Construction, Infrastructure
Pending Verification
$26,000,000 CJ est. value
Halfmoon, NY 12065

Luxury Apartments and Retail Development
Demolition, New Construction, Infrastructure
Conception
$37,000,000 CJ est. value
Clifton Park, NY 12065

Playground Upgrades, Clement Park
Infrastructure
Design
$190,000 CJ est. value
Waterford, NY 12188

Last Updated 12/01/2022 02:03 PM
Project Title

Raw Water Source Dam and Transmission Improvements Contract No 1 and Contract No 2

Physical Address View project details and contacts
City, State (County) Mechanicville, NY 12118   (Saratoga County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $575,455 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contract 2 has been awarded to James H. Maloy, as Jersen withdrew their bid. Contract 1 has been awarded to Rifenburg Construction Inc.." The Project consists of the following Scopes of Work: Contract 1 - General Construction: The project includes relocation of approximately 880 linear feet of new 16-inch transmission main and demolition and removal of existing main under Terminal Reservoir. Dredging of 16,000 cubic yards of Terminal Reservoir to restore the reservoir to its original design capacity. Dredging of approximately 575 linear feet of drainage ditch along George Thompson Rd and restoration thereof. Contract 2 - General Construction: The project includes upgrades and repairs at the Mechanicville Dam Spillway and outlet headwall. Work will include a bypass and dewatering plan, erosion and sediment control, and restorations of the work area. Bid security shall be furnished in accordance with the Instructions to Bidders. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All listed iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. The deminimis and minor components waiver apply to this contract. Pig Iron Waiver - This waiver permits the use of pig iron and direct reduced iron manufactured outside of the United States in domestic manufacturing processes for iron and steel production that are subsequently used in iron and steel products for water and waste projects funded by WEP. Approval of this waiver is supported by Section 746 (b)(2), which allows for a waiver in cases where "...iron and steel products are not produced in the United States in sufficient and reasonably available quantities or of a satisfactory quality." The effective date of this waiver will be retroactive to 5 May 2017. The Work will be substantially completed within __270__ days

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents