Similar Projects
Sauquoit Creek Channel and Floodplain Restoration Program, Project II
Results
$3,000,000 to $3,500,000 est. value
Whitesboro, NY 13492

Cured-In-Place Pipelining - Term Construction Contract 7
Results

Culvert Replacement Project 19, Remove and Replace Culverts at Various Locations
Results
Less than $2,800,000 est. value
NY

Pedestrian Action Safety Plan for Crosswalks
Results
$3,500,000 est. value

Rome Waterfront Village - Phase 2
Infrastructure
Post-Bid
Rome, NY

Storm Water Drainage Ditch in White Birch Road
Infrastructure
Results
Utica, NY 13502

Utica Pedestrian Safety Action Plan
Infrastructure
Results
$350,000 est. value
NY

Waterfront Village Phase 1 - James Street Pedestrian Overlook Project
Infrastructure
Results
$725,000 est. value
Rome, NY

Deerfield Tank Slope Stabilization Improvements
Infrastructure
Results
$350,000 est. value
NY

Regional Drainage and Culvert Cleaning (Statewide)
Term Contract, Infrastructure
Post-Bid

Town of Vernon Municipal Office Parking Lot Resurfacing
Infrastructure
Post-Bid
Vernon, NY 13476

Large Culvert Replacements
Infrastructure
Post-Bid
$2,700,000 est. value
Rome, NY

Rome Facility Trench Drain Repairs
Infrastructure
Bidding
Rome, NY 13440

New Concrete Walks and Related Work on Culver Avenue - Phase 2
Infrastructure
Bidding
Utica, NY 13501

Concrete and Granite Curb Cutting Services at Various Locations
Term Contract
Post-Bid
Rome, NY

Reported 03/25/2022 12:00 AM
Project Title

Mohawk River Trail Phase 2

Physical Address View project details and contacts
City, State (County) Rome, NY   (Oneida County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes providing all labor, materials, machinery, tools, equipment, and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: The project is for the construction of the Mohawk River Trail Phase 2. A 10 ft wide trail will begin just north of East Chestnut Street Bridge (NYS 825). The trail will travel northward while paralleling the Mohawk River. In all, phase 2 of construction will see the Mohawk River Trail extend roughly one mile to Wright Settlement Road (CR 47). The project also includes drainage improvements, signage installations, and various landscaping improvements.

Details

Division 10 - Specialties, Signage.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents