Similar Projects
Turner Fairbank Highway Research Center Project VA ST TFHRC 50(5)
Infrastructure
Bidding
$2,000,000 to $5,000,000 est. value
McLean, VA 22101

Rocky Run Tributary at Dulles Access Road (DF9121)
Alteration
Bidding
$900,000 est. value
Mc Lean, VA 22102

Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Spring 2021 Multiple Stream Restoration Projects
Post-Bid
$2,000,000 to $4,000,000 est. value
VA

Piney Branch Stream Restoration - Construction
Results
Less than $1,600,000 est. value
Vienna, VA 22160

Drainage Improvements Fairfax Camp 30 AHQ Maintenance Facility
Results
Fairfax, VA 22030

Reston Metro Center Walkway
Alteration
Construction
Reston, VA 20191

Storm Drainage System Rehabilitation
Term Contract
Post-Bid
VA

Stream Restoration of Tusico Branch (Phase 2)
Results
Less than $942,500 est. value
Fairfax, VA

HDPE Double Wall Pipe
Infrastructure
Post-Bid

Herndon Metrorail Intermodal Access Improvements Project
New Construction
Results
Herndon, VA

Corrugated Metal Pipe
Term Contract, Infrastructure
Post-Bid
VA

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Blue Heron Landing Park
Renovation, Demolition, Infrastructure, Alteration
Post-Bid
Less than $775,000 est. value

Piney Run at Lake Werowance Stream Restoration
Infrastructure
Results
Less than $3,348,032 est. value
VA

Last Updated 06/02/2022 10:38 AM
Project Title

Pre-Qualification for Coon Branch at Annandale Park Stream Restoration(AC82-0002)

Physical Address View project details and contacts
City, State (County) Annandale, VA   (Fairfax County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 to $4,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a stream restoration project. Restoration of approximately 1,600 linear feet of stream channels utilizing Natural Channel Design.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents