Similar Projects
Lancaster Road Sidewalk
Infrastructure
Bidding
Homewood, AL 35209

Saulter Road Sidewalk
Infrastructure
Bidding
Homewood, AL 35209

Multi-Use Recreational Trail Expansion along SR-1 (US-431)
Post-Bid
$1,000,000 to $2,000,000 est. value
Guntersville, AL 35976

MOWA Choctaw Housing Authority Park and Walking Trail
Post-Bid
Mount Vernon, AL 36560

Pollard Road Sidewalk Project TAPAA-TA17 (933)
Results
$350,000 to $500,000 est. value
Daphne, AL 36526

Bayfront Street Scape and Parking Improvements
Results
Daphne, AL 36526

Fred Walker Subdivision Carports
New Construction, Infrastructure
Construction
Atmore, AL

Son's Ford Parking Lot
Infrastructure
Pending Verification
Auburn, AL

Bob Williams Subdivision
Infrastructure
Pending Verification
Mobile, AL

Parking Lot at Saraland High School
Infrastructure
Bidding
Saraland, AL 36571

Walking Trail Tennessee River to Montgomery Avenue
Post-Bid
Sheffield, AL 35660

Sidewalk along Old Shell Road
Results
Less than $200,000 est. value
Mobile, AL

Parking Lot Phase 1 - Children's and Women's Hospital Pediatric Emergency Department
Infrastructure
Bidding
Mobile, AL 36604

MUD Creek Boat Ramp Parking Lot Repaving
Post-Bid
Hollywood, AL 35752

ADA Compliant Sidewalk Improvements
Results
Less than $380,049 est. value
Gadsden, AL 35902

Last Updated 12/03/2021 08:57 AM
Project Title

Ridgewood Drive Sidewalk

Physical Address View project details and contacts
City, State (County) Daphne, AL 36526   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $144,465
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will consist of extending the sidewalk that runs through the median along Ridgewood Drive 0.32 miles from where it is currently terminated at Brentwood Drive to Bay View Drive in Lake Forest Subdivision. The overall scope of work shall include the installation of 885 square yards of 5 ft wide sidewalk with curb ramps, pedestrian crosswalks, and signage where required, along with relative grading work and utility relocations to accommodate the new sidewalk. Also included will be installation of sod in all disturbed vegetated areas, erosion control BMP’s, and traffic control to accommodate the improvements.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents