Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

2021 Bond Issue Phase 1 Packet 2 - Saint James Elementary School - Contract #3 - Electrical Reconstruction
Renovation
Sub-Bidding
$80,000 CJ est. value
Saint James, NY 11780

2021 Bond Issue Phase 1 Packet 3 - Contract #6 Electrical Reconstruction
Renovation
Sub-Bidding
$2,000,000 CJ est. value
Smithtown, NY 11787

Interior Lighting Upgrades at Central Administration Building
Alteration
Post-Bid
Dix Hills, NY 11746

Huntington Town Hall Standby Generator
Alteration
Post-Bid
Huntington, NY

North Sea Landfill Community Solar Development
Alteration
Results
Southampton, NY 11968

NEC Migration, Installation and Maintenance
Term Contract, Alteration
Results
NY

Our Lady of Consolation Generator Install
New Construction, Alteration
Construction
West Islip, NY 11795

E-rate Services for Switches and Wireless Access Points and Associated Equipment
Term Contract
Sub-Bidding
Islip Terrace, NY 11752

Accabonac Solar Farm Pollinator Meadow
Infrastructure
Post-Bid
East Hampton, NY 11937

Emergency Generator, Buildings 45, 47 and 56
Alteration
Results
$500,000 to $1,000,000 est. value
Brentwood, NY 11717

Mastics Moriches Shirley Library - Electrical
Renovation
Sub-Bidding
$400,000 CJ est. value
Shirley, NY 11967

Annual Requirements Contract - Lighting
Term Contract, Alteration
Post-Bid
NY

Accabonac Solar Farm Pollinator Meadow
Alteration
Results
East Hampton, NY

Post Top LED Retrofit Kits
Term Contract
Post-Bid
Brookhaven, NY

Last Updated 12/19/2022 11:03 AM
Project Title

Federal Funded Capital Improvement Program - Contract 4 Electrical Reconstruction

Physical Address View project details and contacts
City, State (County) Deer Park, NY 11729   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,669,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of December 19, 2022, the project will not be awarded and all bids were rejected. It will rebid in the near future. No anticipated date determined. For Federal Funded Capital Improvement Program - Contract 4 Electrical Reconstruction SED#58-01-07-03-0-007-033-JOHN Q. ADAMS ES 58-01-07-03-0-006-063- DEER PARK HIGH SCHOOL 58-01-07-03-0-004-040- MAY MOORE ES 58-01-07-03-0-002-043-JOHN F. KENNEDY INTERMEDIATE SCHOOL 58-01-07-03-0-008-038 ROBERT J FROST MIDDLE SCHOOL The bid deposit shall be refunded to each Bidder only if the plans and specifications are returned, in good condition, with no handwritten notations thereon within (30) calendar days after the bid opening date. All deposits shall be forfeited to the School District after the (30) days have elapsed. Any person or corporation who fails to submit a bid shall forfeit their hard copy plan deposit in its entirety. Each Bidder must deposit, with their sealed bid, security in an amount not less than 10% of the base bid and all Alternate Bids in the proper form subject to the conditions set forth in the Instructions to Bidders (Page 3). Attention of the Bidders is specifically directed to the minimum wage rates to be paid under the contract, as well as to other provisions set forth in the bidding documents. Bidder will also be required to show, to the satisfaction of the DEER PARK UFSD that they are carrying Workers Compensation Insurance as required by law and all other Insurance in amounts not less than that specified under the General Conditions. Performance Bonds and Labor/Material Bonds, as called for in the General Conditions are a requirement of each contract. The DEER PARK UFSD reserves the right to reject any or all bids submitted, to waive any informality or irregularity in any bid, and/ or to accept any bid in whole or in part and/ or to award or not award the contract, if in the opinion of the DEER PARK UFSD, the best interest of the SCHOOL DISTRICT will thereby be served. This invitation is an offer to receive bids for a contract. The successful Bidder will be required to execute a formal contract in the form contained in the Contract Documents. All bids received after the time stated in the Notice to Bidders will not be considered and will be returned unopened to the bidder. The bidder assumes the risk of any delay in the mail or in the handling of the mail by employees of the SCHOOL DISTRICT. Whether sent by mail or by means of personal delivery, the bidder assumes responsibility for having its bid deposited on time at the place specified. Each Bidder shall agree to hold their bid price for (45) days after the formal bid opening. Per Article 8, Section 220 of the New York State Labor Law, every contractor and sub-contractor shall submit to the SCHOOL DISTRICT within (30) days after issuance of its first payroll, and every (30) days thereafter, a transcript of the original payroll record, as provided by this article, subscribed and affirmed as true under penalties of perjury. The SCHOOL DISTRICT shall be required to receive and maintain such payroll records. The original payrolls or transcripts shall be preserved for (5) years from the completion of the work on the project

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents