Similar Projects
Palmyra Township HMA
Bidding
IL 61021

County Road Improvements
Bidding
IL

A1 and A2 Seal Coat
Post-Bid
Amboy, IL 61310

Central Division – Asphalt Paving Maintenance
Post-Bid

Anchor Road Resurfacing
Results
Dixon, IL 61021

RR-19-9018R (I-88) Pavement and Structural Preservation
Results
Less than $10,000,000 est. value
Amboy, IL 61310

Milling/Resurfacing/ADA Improvements
Bidding
Amboy, Lee Center, Sublette, IL

Franklin Grove Patching
Post-Bid
Franklin Grove, IL

Cold Milling and Hot Mix Asphalt Resurfacing from 0.1 Mile West to 0.1 Mile East of Franklin Creek Located West of Franklin Grove
Results
Franklin Grove, IL

0.80 Miles, Cold Milling, Pavement Patching, HMA Resurfacing, ADA Improvement and Traffic Signal Modernization
Bidding
Dixon, IL 61021

Lee County Patching
Post-Bid
IL

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Bidding

2021 General Street Maintenance - Seal Coating
Post-Bid
Less than $133,000 est. value
Amboy, IL

Bituminous Seal Coat
Results
IL

Last Updated 07/08/2020 06:06 AM
Project Title

2020 Motor Fuel Tax General Street Maintenance

Physical Address View project details and contacts
City, State (County) Amboy, IL 61310   (Lee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $70,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Preparation of aggregate bases, application of bituminous materials (prime coat), application of a double (A-2) seal coat on various streets and alleys. The project also consists of the placement of bituminous patching mixture and the application of a single (A-1) seal coat on various streets. Project quantities are as follows: Preparation of Base: 4,551 sq. yd.; Bituminous Materials (Prime Coat): 1,626 gallons; Bituminous Patching Mixture: 39 tons; Bituminous Materials (Seal Coat): 6,205 gallons; Seal Coat Aggregate: 219 tons.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents