Similar Projects
Reported | 03/05/2022 12:00 AM |
Project Title | Longhouse Scenic Drive and Jakes Rocks Road Rehabilitation Project |
Physical Address | View project details and contacts |
City, State (County) | Warren, PA (Warren County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The U.S. Army Corps of Engineers, Pittsburgh District, on behalf of the USDA Forest Service, Allegheny National Forest, Bradford Ranger District, have a rehabilitation project pertaining to Longhouse Scenic Drive (FR 262) and Jakes Rocks Road (FR 492 and FR 492A) within the Allegheny National Forest, in which these asphalt pavement roads have a cumulative total length of approximately 14.3 miles. The Longhouse Scenic Drive and Jakes Rocks Road Rehabilitation Project (Project) generally involves the following: Removing the two largest existing culverts, in which one is also the deepest existing culvert, and installing two Aquatic Organism Passage (AOP) structures with associated stream restoration; Removing and installing other culverts, some of which are generally considered deep and/or generally considered large; Repairing a landslide with a riprap buttress system; Rehabilitating existing asphalt pavement roads and parking areas to varying degrees; Installing proposed vehicular pull-off areas and appurtenant features; Removing and installing road signs and posts; Installing pavement markings; Repairing, re-setting, and/or replacing guide rail elements; Removing and installing delineators; Performing roadside brushing, tree trimming, and removal; Rehabilitating roadside ditches; Installing erosion protection at culvert outlets; Rehabilitating appurtenant features of parking areas; Preparing areas to serve as temporary stockpiles and/or permanent waste disposal sites; Executing various measures to facilitate work, including traffic control, diversion of water, erosion and sedimentation control, and others. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |