Similar Projects
Sawtooth Campground & Cabins
New Construction, Infrastructure
Conception
Hill City, SD

Grading, Interchange Reconstruction, PCC Surfacing
Infrastructure
Conception
$33,216,000 CJ est. value
New Underwood, SD 57761

Block 5 Project
New Construction, Infrastructure - 5,000 SF
Design
$60,000,000 CJ est. value
Rapid City, SD 57701

E. Anamosa Street - Street and Storm Sewer Repairs
Infrastructure
Design
$1,047,175 CJ est. value
Rapid City, SD 57703

Mineral Industries Building at the South Dakota School of Mines and Technology
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Rapid City, SD 57701

Sunburst Drive Reconstruction
Infrastructure
Bidding
$2,500,000 CJ est. value
Rapid City, SD 57702

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 Fire Hydrant Installation Annual
Term Contract
Post-Bid
Rapid City, SD

East Watertown Street Water Main Replacement
Results
Rapid City, SD 57701

General Aviation Access and Commercial Terminal Return Road
Infrastructure
Results
$2,750,000 est. value
Rapid City, SD

Liberty Plaza Mixed Use
New Construction - 450,000 SF
Construction
$110,000,000 est. value
Box Elder, SD 57719

McMahon Subdivision Apartment Complex
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Rapid City, SD 57701

Skyline Pines East Subdivision
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Rapid City, SD 57701

Rockfall Hazard Mitigation
Infrastructure
Conception
$1,624,000 est. value
Caputa, SD 57725

Full Depth Reclamation, AC Surfacing, Mill, AC Resurfacing, Pipe Work
Infrastructure
Design
$8,494,000 CJ est. value
East Central Pennington, SD 57725

Last Updated 08/26/2022 12:03 PM
Project Title

Perrine And Unnamed Tributary Drainage Basin Design Plans Phase 4 Miscellaneous Improvements - 51189.4 - City Of Rapid City

Physical Address View project details and contacts
City, State (County) Rapid City, SD 57701   (Pennington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,253,911 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Perrine And Unnamed Tributary Drainage Basin Design Plans Phase 4 Miscellaneous Improvements This project is included in the city's 2022-2027 Capital Improvement Plan (CIP). As of August 26, 2022, an engineer has been selected for the project. Information regarding the the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents