Similar Projects
2022 Sewer Lining
Infrastructure
Bidding
$137,725 est. value
Mount Clemens, MI

Sidewalk Construction and Storm Outfall Repair
Alteration
Bidding
Norton Shores, MI

VGLZ 1252028 Repair NW Sewer Line at SANGB M
Post-Bid
$1,000,000 to $5,000,000 est. value
Harrison Township, MI 48045

Kids Creek 14th Street Storm Drain Project
Post-Bid
Traverse City, MI

2019 Storm Sewer Improvement
Results
$189,969 est. value
Saint Clair Shores, MI

Lake Superior Urban Stormwater/Coastal Wetland Restoration Project
Results
Marquette, MI

Cornerstone Alliance - Industrial Park Stormwater Project
New Construction
Construction
Benton Harbor, MI 49022

Wastewater Collection System Improvements Contract No. 3
Post-Bid
Vicksburg, MI 49097

Flint GM Fisher Guide Site (Chevy Commons Parcel A)
Results
Flint, MI

North Interceptor East-Arm PCI-4 Rehabilitation Contract No-1
Post-Bid
Waterford, MI 48328

Storm Sewer Separation C-5 Phase 2C
Results
Dearborn, MI

Construct Green Infrastructure Improvements To The Property Located At 4401 Conner St
Post-Bid
Detroit, MI 48200

Storm Sewer Separation, Phase 3
Results
Dearborn, MI

Catch Basin Cleaning - County Roads
Term Contract
Post-Bid
Jackson, MI

2019-2020 Roadway Improvements Project
Results
Marysville, MI 48040

Last Updated 09/03/2021 03:28 PM
Project Title

Collier Road Landfill Stormwater Spillway Repairs

Physical Address View project details and contacts
City, State (County) Pontiac, MI 48341   (Oakland County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the repairs of the benches of two existing hard-armored spillways on the north side of Collier Road Landfill. The benches will be widened, reno mattresses will be placed over them, and riprap will be added around the perimeters of the benches. The project also requires the contractor to fill the voids under the undermined spillway benches with flowable fill and to make repairs as required per Part 115 rules to the 2’ compacted clay cap, replacing it with either 2’ of compacted clay or with a geosynthetic clay liner

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents