Similar Projects
Charles City Road Sewage Pumping Station Interim Odor and Corrosion Mitigation
New Construction
Bidding
Richmond, VA 23231

Plaza Bethune Pump Station No. 519 Replacement and Force Main Rehabilitation
Post-Bid
Less than $1,773,150 est. value
Virginia Beach, VA 23456

Crozet Flow Equalization Tank and Pumping Station Upgrade
Post-Bid
Charlottesville, VA

Building 508 Repair Wet Well Pump Station
Results
$500,000 to $1,000,000 est. value
Portsmouth, VA

Rady Park Pump Station Replacement
Results
Warrenton, VA

Pump Station 23 Service Area Phase 8
Construction
Less than $4,500,000 est. value
Norfolk, VA

Langley School Pump Station and Force Main
Construction
$3,400,000 est. value
McLean, VA 22101

Qualification of CMAR - Quarry A (Milestone Reservoir) and Raw Water Pumping Station
Post-Bid
VA

Construction of the Leachate Pump Station
Results
$2,586,790 est. value
Leesburg, VA 20175

St. Paul's Pump Station #156
New Construction
Construction
$3,000,000 to $3,737,570 est. value
Norfolk, VA 23504

Design Build Services of Ivy Creek Interceptor Division 5 and 6 and Route 460 Pump Station
Post-Bid
Roanoke, VA

Route 50 Pump Station Replacement
Results
$1,500,000 to $2,500,000 est. value
Winchester, VA

Pump Station Communications Upgrade Project
Post-Bid
Portsmouth, VA

Chain Bridge Pump Station Modifications Project P2663, Division 001
Results
Fairfax, VA

Pre-Qualification for Savile Lane Pump Station Rehabilitation
Post-Bid
$2,000,000 to $4,000,000 est. value
McLean, VA 22101

Last Updated 11/18/2021 10:09 AM
Project Title

Bethel-Poquoson Force Main Phase II (Wythe Creek Road) Replacement

Physical Address View project details and contacts
City, State (County) Poquoson, VA 23662   (Hampton City County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,265,935
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project or Work consists of the installation of approximately 3,700 linear feet of 20-inch HDPE force main to replace an existing out of service 20-inch PCCP force main to be abandoned as part of this project.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents