Similar Projects
Last Updated | 09/19/2023 03:13 PM |
Project Title | London Waterway Expansion |
Physical Address | View project details and contacts |
City, State (County) | Palm Coast, FL 32137 (Flagler County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Shoreline/Erosion/Drainage, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $8,972,745 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The City of Palm Coast is seeking qualified Contractors to expand the Stormwater attenuation and treatment capacity of the London Waterway by construction of a lake on City-owned property that is adjacent to the London Canal, in accordance with the attached set of construction plans. The stormwater storage capacity lake to be created is located in the Matanzas Woods Neighborhood on the northern part of Palm Coast City Limits (see location maps) and is surrounded by residential homes. Access to this site will be through easements and indicated on construction plans. The Contractor shall provide all work required for a completed project including, but not limited to labor, supervision, traffic control, materials, equipment, installation, and incidentals required for a complete project. CONTRACTOR shall also provide material samples, as necessary, to ensure compliance with manufacturers recommendations. Installation of all materials shall be in accordance with all applicable CITY standards and requirements, applicable Florida Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction (latest edition), manufacturer and industry preferred standards. Total construction time to achieve Substantial Completion is Three Hundred and Sixty (360) consecutive calendar days from the date of the “Notice to Proceed,” with an additional forty-five (45) consecutive calendar days to achieve Final Completion |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |