Similar Projects
Palm Coast Library Driveway and Parking - Flagler County
Infrastructure
Conception
$435,000 CJ est. value
Palm Coast, FL 32137

SR 100 from N. Palmetto ST to Old Kings Rd South - Florida Department of Transportation
Infrastructure
Conception
$9,500,000 CJ est. value
Bunnell, FL 32110

Secure Space Self Storage
New Construction, Infrastructure - 31,500 SF
Design
$3,400,000 CJ est. value
Palm Coast, FL 32137

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Flagler Palm Coast National Guard Vehicle Maintenance Shop
New Construction, Infrastructure - 31,631 SF
Bidding
$12,500,000 CJ est. value
Palm Coast, FL 32164

Indian Trails Reclaimed Water Main Extension and Control System
Infrastructure
Bidding
$2,030,000 CJ est. value
Palm Coast, FL 32137

Hargrove Grade Road Reconstruction - Flagler County
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Bunnell, FL 32110

Hargrove Grade Road Reconstruction - Flagler County
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Bunnell, FL 32110

Lehigh Trailhead (FDOT)
New Construction, Infrastructure
Results
$300,000 est. value
Palm Coast, FL 32164

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Par Builders Storage
New Construction, Infrastructure - 103,255 SF
Pending Verification
$11,000,000 CJ est. value
Bunnell, FL 32110

Flagler Gun and Archery Club Warehouse
New Construction, Infrastructure - 3,600 SF
Pending Verification
$400,000 CJ est. value
Bunnell, FL 32110

Old Haw Creek Road from County Road 304 to SR 100 - Construction - Flagler County
Infrastructure
Conception
$7,788,650 CJ est. value
Bunnell, FL 32110

Plantation Bay Section 2A-F Unit 16
New Construction, Infrastructure
Design
$29,000,000 CJ est. value
Bunnell, FL 32110

Long Creek Nature Preserve - Phase 2
Infrastructure
Bidding
$200,000 CJ est. value
Palm Coast, FL 32137

Last Updated 09/19/2023 03:13 PM
Project Title

London Waterway Expansion

Physical Address View project details and contacts
City, State (County) Palm Coast, FL 32137   (Flagler County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $8,972,745 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Palm Coast is seeking qualified Contractors to expand the Stormwater attenuation and treatment capacity of the London Waterway by construction of a lake on City-owned property that is adjacent to the London Canal, in accordance with the attached set of construction plans. The stormwater storage capacity lake to be created is located in the Matanzas Woods Neighborhood on the northern part of Palm Coast City Limits (see location maps) and is surrounded by residential homes. Access to this site will be through easements and indicated on construction plans. The Contractor shall provide all work required for a completed project including, but not limited to labor, supervision, traffic control, materials, equipment, installation, and incidentals required for a complete project. CONTRACTOR shall also provide material samples, as necessary, to ensure compliance with manufacturers recommendations. Installation of all materials shall be in accordance with all applicable CITY standards and requirements, applicable Florida Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction (latest edition), manufacturer and industry preferred standards. Total construction time to achieve Substantial Completion is Three Hundred and Sixty (360) consecutive calendar days from the date of the “Notice to Proceed,” with an additional forty-five (45) consecutive calendar days to achieve Final Completion

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents