Similar Projects
HDPE Pipe
Post-Bid
Montrose, PA 18801

Mattes Road Culvert Replacement
Post-Bid
Friendsville, PA 18818

Flood Restoration Project
Results
Montrose, PA 18801

Flood Restoration Projects
Results
Hop Bottom, PA 18824

State Game Lands #183 Shooting Range Improvements
Post-Bid
Palmyra, PA

Hop Bottom Sediment Basin Reconstruction Project
Results
Hop Bottom, PA 18824

Flood Restoration Project
Results
Susquehanna, PA 18847

Stacked Stone Wall - Fall Brook Run - Salt Springs State Park
Results
$100,000 to $500,000 est. value
PA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Tinkerbrook & Welch Hill Roads Aluminum Box Culverts General Construction Contract
Results
$200,000 to $250,000 est. value
Clifford, PA 18413

Drainage Work on Peterson Road
Results
$117,000 est. value
Dimock, PA 18801

FEMA Stream Restoration Project
Results
Hop Bottom, PA 18824

Herb Button Road Culvert Replacement Project
Results
Springville, PA 18844

SR 1021 Emergency Pipe Replacement
Results
$1,000,000 to $2,499,999 est. value
PA

SR 171 Emergency Pipe Replacement
Results
Less than $99,999 est. value
PA

Last Updated 10/08/2020 08:25 AM
Project Title

Drainage Project

Physical Address View project details and contacts
City, State (County) Susquehanna, PA 18847   (Susquehanna County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of 2 new 15” HDPE cross pipes with stacked stone headwalls and endwalls. Create dry wells at outlet of pipes using non-woven geotextile fabric and 4”- stone on 3rd Ave. Replace existing driveway pipe on 3rd Ave. with 15” HDPE pipe, include stacked stone headwalls and endwalls, and create asphalt apron with swale across driveway to divert water to the ditch line. Removal existing pavement on 3rd Ave. for approximately 360’, create underdrains for 1, possibly 2 spring seeps under road using 6” perforated underdrain and 2A aggregate Repave 360’ at a 12’ cartway on 3rd Ave Line approximately 150’ of ditch with geotextile fabric and fill with R-3 riprap along 3rd Ave. Replace existing catch basin at corner of 3rd Ave. and Pierce St. with an as built basin. Existing pipes will remain Line approximately 300’ of ditch with geotextile fabric and fill with R-3 riprap along Pierce St. Create ditch along bank at upper driveway on Pierce St. to carry water away from roadway Install new 15” HPDE pipe in upper driveway on Pierce St. Include stacked stone headwalls and endwalls and create asphalt apron with swale to divert water to the ditch line. Seed and Mulch all disturbed areas.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents