Similar Projects
Germania Park Redevelopment Phase 4 - City of Mankato
Infrastructure
Conception
$2,127,844 CJ est. value
Mankato, MN 56001

Germania Park Redevelopment Phase 4 - City of Mankato
Infrastructure
Conception
$2,127,844 CJ est. value
Mankato, MN 56001

Eastwood Industrial Park Office and Warehouse Development
New Construction, Infrastructure - 50,000 SF
Design
$26,850,000 CJ est. value
Mankato, MN 56001

Jackson Park Apartments
New Construction, Infrastructure - 66,000 SF
Design
$10,000,000 CJ est. value
Mankato, MN 56001

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Wastewater Treatment Plant
Demolition, Infrastructure
Post-Bid
$125,000 CJ est. value
Vernon Center, MN 56090

Water System Improvements
Infrastructure
Results
$1,335,000 est. value
Skyline, MN

MNSU-22-Lot 1 Improvements
Infrastructure
Results
$1,016,000 est. value
Mankato, MN 56001

Harrison Ford Automobile Dealership Addition
Addition, Demolition, Infrastructure - 3,941 SF
Construction
$1,000,000 CJ est. value
Mankato, MN 56001

District 22 - APX Contractor Campus
New Construction, Infrastructure - 31,509 SF
Construction
$3,402,972 CJ est. value
Mankato, MN 56001

Frost Plaza
New Construction, Infrastructure - 5,759 SF
Pending Verification
$2,000,000 CJ est. value
Mankato, MN 56001

Cambria
New Construction, Infrastructure - 11,215 SF
Pending Verification
$2,960,760 CJ est. value
Mankato, MN 56001

Civic Center Ramp - Exterior Improvements - City of Mankato
Infrastructure, Renovation
Conception
$250,000 CJ est. value
Mankato, MN 56001

Fox Meadows Residences
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Eagle Lake, MN 56024

Envelope Improvements
Renovation, Infrastructure
Post-Bid
$290,000 CJ est. value
Mankato, MN 56001

Last Updated 01/21/2023 02:05 AM
Project Title

Indian Creek Pump Station Facility and Electrical - City of Mankato

Physical Address View project details and contacts
City, State (County) Mankato, MN 56001   (Blue Earth County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2026
Bids Due View project details and contacts
Estimated Value $806,916 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Indian Creek Pump Station is located northeast of the Sibley Parkway and Poplar Street Intersection. The total drainage area for the Indian Creek pump station is approximately 5,720 acres, however, during blocked flow conditions, approximately 3,800 acres of the watershed is diverted to the Blue Earth River. The Indian Creek pump station has four vertical turbine pumps, with a design capacity of 136,000 gpm As January 21, 2023, this project is currently in the FY 2023 - 2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2026. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents