Similar Projects
SR 1023 over Equinunk Creek
Demolition, New Construction, Infrastructure
Conception
$824,115 CJ est. value
Cadosia, NY 13783

Removal of Steel Pilings, Grading of Site, and Armoring of Stream Bank - Village of Walton
Infrastructure
Bidding
$250,000 CJ est. value
Walton, NY 13856

Regional Drainage and Culvert Cleaning (Statewide)
Term Contract, Infrastructure
Post-Bid

Highway Bridge Culverts and Road Repair
Infrastructure
Post-Bid
Hancock, NY

Job Order Contract (JOC), Highway and Drainage
Infrastructure
Results
$900,000 est. value
Delancey, NY

Gravel
Infrastructure
Post-Bid
Meridale, NY

Geotechnical Subsurface Explorations
Infrastructure
Post-Bid
$500,000 est. value
Angelica, Chemung, Chittenango, Schoharie, NY 14825

Construction of the Village of Sidney Water System Improvements Project - New Water Meters Contract 4A, 4B
Infrastructure
Post-Bid
$607,447 CJ est. value
Sidney, NY 13838

Village of Franklin Water Tank Project
New Construction, Infrastructure
Post-Bid
$791,500 CJ est. value
Franklin, NY 13775

ADA Upgrades for Evenden Tower and Welding Lab
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Delhi, NY 13753

The Coles Clove SL 4.62 Bank Stabilization Project
Infrastructure
Post-Bid
$110,000 CJ est. value
Delancey, NY 13752

Utility Crossing Site #8: West Brook - Delaware Street Bridge Project
Infrastructure
Post-Bid
$500,000 CJ est. value
Walton, NY 13856

Village Well - Bank Stabilization Project
Infrastructure
Post-Bid
$200,000 CJ est. value
Walton, NY 13856

Water Well
Infrastructure
Post-Bid
$179,000 CJ est. value
Walton, NY 13856

Replacement of Arbor Hill Bridge Over Little Delaware River
Demolition, New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Delhi, NY 13753

Last Updated 04/12/2023 02:53 PM
Project Title

Box Culvert Replacement on Elk Creek Road

Physical Address View project details and contacts
City, State (County) Meredith, NY 13753   (Delaware County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Box Culvert Replacement on Elk Creek Road. The Town Of Meredith reserves the right to refuse any non-responsive bid, and to accept the bid best suited for its specific needs.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents