Similar Projects
Musc Ashley River Tower Water Intrusion
Alteration
Bidding
$300,000 est. value
Charleston, SC 29401

Palmetto Commerce Parkway Interchange Improvements Water Main Relocation
Post-Bid
Ladson, SC 29456

Construction of Summerville Avenue, Meeting Street, Tuxbury Lane Water Main Connectors
Post-Bid
Charleston, North Charleston, SC 29405

Beach Club Villas Water Main Replacement
Results
Isle of Palms, SC 29451

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Grove, Wagener, and Laurens Streets Water Main Replacement Project
Post-Bid
Charleston, SC

Dunecrest Lane Water Main Replacements
Results
Isle of Palms, SC 29451

Bainbridge Avenue Water Main Replacement Project
Infrastructure
Post-Bid
Charleston, SC 29407

2020 Line Stop Project on Meeting Street Road
Infrastructure
Results
North Charleston, SC 29405

Seawater Intake Repair
Term Contract
Post-Bid
Charleston, SC 29412

Road Work - E. Ashley Avenue, Folly Beach Drainage Improvements, Waterline Replacement and Sidewalk Replacement CTC
Infrastructure
Results
Charleston, SC

East Cooper Avenue to East Hudson Avenue Water Main Replacement
Infrastructure
Post-Bid
Folly Beach, SC 29439

2021 Force Main Rehabilitation Program
Infrastructure
Results
North Charleston, SC

Water and Sewer Utility Replacements
Infrastructure
Post-Bid
$400,000 to $600,000 est. value
Isle of Palms, SC

Anoxic Baffling Improvement Project
Infrastructure
Results
North Charleston, SC 29405

Last Updated 05/03/2022 11:56 AM
Project Title

Mt. Zion Elementary School - Auldreeke Road Water Main Improvements

Physical Address View project details and contacts
City, State (County) Johns Island, SC 29455   (Charleston County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $179,250
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes but is not limited to the removal of walls between rooms This Scope of Work includes but is not limited to the extension of existing water main within right-of-way, including required pavement cuts, milling, and trenching at River Road, trenching and installation of new 8” PVC water main extension, fire hydrant, and 2- inch water meter as illustrated.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents