Similar Projects
Union Street Phase 2 Sewer Separation
Bidding
Less than $3,600,000 est. value
New Bedford, MA 02740

Water Treatment Chemicals - Cross Connection Services, Sewer Camera Inspection Services, and Septic Pumper Services
Post-Bid
Somerset, MA

Produce and Grease Trap Maintenance
Post-Bid
Taunton, MA

Police and Fire Station Sewer Replacement Project
Results
Less than $105,000 est. value
Fairhaven, MA 02719

DPW Services - Catch Basin Cleaning
Term Contract
Results
Mansfield, MA

Utility Manhole Frames and Covers
Post-Bid
Taunton, MA

DPW Services - Catch Basin Cleaning with Sump Measurement
Term Contract
Results
Mansfield, MA

Route 6 Pump Station Improvements and Sewer and Water Rehabilitation
Post-Bid
$920,000 est. value
Somerset, MA

Twin Village Fire Station Plumbing Repairs
Results
Less than $16,500 est. value
Attleboro, MA

Cross County Sewer Line Access Improvements
Results
Less than $100,000 est. value
Raynham, MA

Sewer Upgrade, Roadway and Sidewalk Improvements
Results
Less than $369,765 est. value
Norton, MA 02766

Road Materials - Catch Basins, and Manholes
Results
Berkley, MA

Road Materials - Manhole and Catch Basin Covers
Results
Berkley, MA

Road Materials - Catch Basin Cleaning
Results
Berkley, MA

Main Lift Pump Station Influent Sewer and Force Main
Results
Less than $3,700,000 est. value
Taunton, MA 02780

Last Updated 11/13/2019 11:02 AM
Project Title

Year (5) Five Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) North Attleborough, MA   (Bristol County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes clean, inspect, test and seal 4,762 lf of sewers; install CIPP in 12,125 lf of sewers; install 34 lf of short liner; perform open cut point repairs in 4 locations; exterior sealing and cementitious lining of 105 manholes, CIPP in four 24-inch corrugated metal pipe culverts, and other related tasks.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents