Similar Projects
Engineering, Planning and Development
Post-Bid

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Perform Modifications to the M/V Tustumena, including Temporary Services
Term Contract
Results
$5,000,000 to $10,000,000 est. value

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Point Lay Water and Sewer Upgrade - Design
Infrastructure
Results
Point Lay, AK

Regional A-E Environmental Services
Renovation, Term Contract
Post-Bid

Alaska A&E IDIQ Contract
New Construction, Term Contract
Post-Bid

On Call Engineering Services
Term Contract
Post-Bid
Nuiqsut, AK

Hazardous, Toxic and Radioactive (HTRW) Services
Term Contract
Post-Bid

Public Works Energy A-E Services - Worldwide
Renovation
Post-Bid
$40,000 to $3,000,000 est. value

Architect-Engineering Services to Support The Us. Air Force and AFECE Environmental Program Worldwide "AE ES 2022"
Term Contract
Post-Bid

RFP Design - Planning Department Upgrade and Extension
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Utqiagvik, AK 99723

Reported 10/27/2022 12:00 AM
Project Title

RFP Engineering - Utqiagvik 2017 Storm Recovery - Stevenson Road Site #5 (Tahak) Repair

Physical Address View project details and contacts
City, State (County) Utqiagvik, AK 99723   (North Slope County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Bidding, Request for Proposals (RFPs),
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

In September 2017, a severe storm damaged sections of roadway maintained by the North Slope Borough in Utqiagvik. The project areas affected are Stevenson Street Site 5 (vicinity of Tahak Street, as detailed on Project Worksheet 10) At Stevenson Site 5, storm surge and flooding damaged approximately 600 feet of road surface of Stevenson Street between Tahak Street and Okakok Street. Further detail regarding the project location and specific damages can be found in the Exhibit A (Scope of Services). This project is a joint effort between NSB, FEMA and the State of Alaska. THIS CONTRACT IS PAID THROUGH A COMBINATION OF 75% FEDERAL AND 25% STATE FUNDS THROUGH DISASTER GRANT 4351 DR-AK. The method of contractor selection has not been determined at this time.

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents