Similar Projects
Emerson Avenue Improvements
Design
$27,631,381 est. value
Indianapolis, IN 46204

Bridge Replacement
Bidding
IN

Small Structure Pipe Lining
Bidding
IN

I Beams 6X9x20
Post-Bid
Indianapolis, IN 46077

Marengo Industrial Park Roadway Engineering Services
Post-Bid
Marengo, IN 47140

Bridge Thin Deck Overlay
Results
IN

Bridge Thin Deck Overlay
Results
IN

Bridge Replacement
Bidding
Greenwood, IN 46143

Bridge Replacement
New Construction, Demolition
Post-Bid
Madison, IN 47250

Bridge Deck Overlay
Results
IN

Bridge Replacement and Bank Stabilization in Brookshire Golf Club
New Construction
Bidding
Less than $1,000,000 est. value
Carmel, IN

Bridge No. 62 on Stonington Road Over Fishing Creek
Post-Bid
Bedford, IN 47421

Bridge Thin Deck Overlay and Small Structure Replacement
Results
IN

Bridge 174 and 175 Replacement
New Construction
Bidding
Lebanon, IN

Intersection Improvement and Small Structure Replacement
Post-Bid
Queensville, IN

Last Updated 02/02/2021 01:28 PM
Project Title

Porter County Bridge #73 Replacement

Physical Address View project details and contacts
City, State (County) IN 46347   (Porter County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the replacement of an existing bridge with a new three-span bridge. The overall purpose of the project is to replace the existing structurally deficient bridge and improve the conveyance of Cobb Ditch under the bridge. The new superstructure shall consist of a reinforced concrete slab deck. The superstructure shall be supported on reinforced concrete abutments on steel H-piles and extended pile piers. A reinforced concrete bridge approach will be used behind both abutments. New approach roadway will consist of 4” of HMA on 10” of Compacted Aggregate No. 53 with Geogrid. Additionally, the approach roadway will be widened 2 ft and earthwork is planned to not include fill for the roadway section. Drainage improvements include new ditches, a 15-inch pipe is planned to be installed beneath the north side of the roadway, and an 18-inch pipe is planned to be installed on the northwest side of the bridge. The project will also include demolition and removal of the existing structure, and installation of the proposed structure. The work includes the carrying out of all duties and obligations and the furnishing of all labor, materials, tools, equipment, and other incidentals necessary or convenient to the successful completion of the project.

Details

Bridge, Demolition.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents