Similar Projects
Dagger Creek Bridge Replacement
Renovation
Design
Challis, ID

Gaoa Jenkins Crossing Trail Bridge Replacement, Payette National Forest
Infrastructure
Bidding
$250,000 to $500,000 est. value
Riggins, ID 83549

Sixth Street Crossing Over Paradise Creek
New Construction, Infrastructure
Bidding
$1,000,000 to $1,300,000 est. value
Moscow, ID

Consultant Services for Sand Road Bridge
New Construction
Post-Bid
ID

Bridge Replacement for Minidoka County
New Construction, Renovation
Post-Bid
Acequia, ID 83350

Replacing the Existing Bridges on I-15 at MP 40.425
New Construction, Infrastructure
Results
$5,000,000 to $10,000,000 est. value
ID

Replace Four Local Bridges
New Construction, Infrastructure
Results
$5,000,000 to $10,000,000 est. value

Bridge Replacement at 500 South 100 West
New Construction, Renovation
Post-Bid
Rupert, ID 83350

South Idaho Canal Bridge
New Construction, Infrastructure
Results
$1,000,000 to $2,500,000 est. value
ID

West Fork Mink Creek Trail Bridge 7059-0.3 and 7059-1.5
Renovation
Post-Bid
Pocatello, ID

Over Snake River Bridge Repairs
New Construction, Infrastructure
Results
$500,000 to $1,000,000 est. value
ID

Bridge Replacement at Elizabeth Park Road
New Construction, Infrastructure
Results
$15,000,000 to $25,000,000 est. value
Kellogg, ID 83837

Big Wood River Bridge
New Construction, Renovation
Results
Ketchum, ID

Third River Crossing Planning and Environmental Linkage (Pel) Study
New Construction
Results

Repairing Bridge Decks With Epoxy or Concrete Overlays
New Construction, Infrastructure
Results
ID

Reported 03/30/2022 12:00 AM
Project Title

Re-Constructing the I-15/I-86 System IC

Physical Address View project details and contacts
City, State (County) ID   (Bannock County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For the work of Re-Constructing the I-15/I-86 System IC in Pocatello, ID. This will replace the 5 existing bridges with 8 new bridges along with reconstructing and realigning the roadway

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents