Similar Projects
Judge Charles R. Rose Community Park
New Construction, Infrastructure
Design
Less than $3,000,000 est. value
Dallas, TX 75241

Preventive Maintenance
Infrastructure
Bidding
$2,472,754 est. value
Dallas, TX

Alley Reconstruction: Dandelion Ln/Trumpet Dr & Thistle Ln/Daisy Ln
Post-Bid
$650,000 to $750,000 est. value
Rowlett, TX 75088

Trinity Crossing Phase 6A Paving Improvements
Post-Bid
Mesquite, TX

Street Reconstruction Group - 17-1006
Results
$1,518,259 est. value
Dallas, TX 75201

Denton Tap Intersection Improvements
Results
$2,777,148 est. value
Coppell, TX 75019

Asphalt, Concrete, Patching, Paving and Curbs
Post-Bid
Carrollton, TX

Quiet Zone - Northeast Dallas
Results
$479,493 est. value
Dallas, TX

McKinney Avenue/Cole Two-Way Conversion
Post-Bid
Dallas, TX 75295

Meadowcreek Paving and Drainage Improvements
Results
Less than $1,970,000 est. value
Garland, TX

2019 Alley Improvements
Infrastructure
Post-Bid
Less than $205,000 est. value
DeSoto, TX 75115

Powell Rd, Orchid Ave, Melton Ln, Magnolia Dr, and Douglas Dr Paving and Utility
Results
Less than $3,980,000 est. value
Mesquite, TX 75149

Sam Rayburn Tollway Frontage Road Concrete Pavement Joint and Crack Sealing
Term Contract
Post-Bid
Carrollton, TX 75008

Annual Crack Seal Program
Term Contract
Results
$150,000 est. value
Rowlett, TX

Maywood Avenue from East Frio Drive to South Denley Drive
Infrastructure
Post-Bid
Dallas, TX 75216

Reported 06/30/2022 11:06 AM
Project Title

Duncanville Rd Widening - City of Cedar Hill

Physical Address View project details and contacts
City, State (County) Cedar Hill, TX 75106   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected April 2024
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A full scope has not been determined. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of June 29, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents