Similar Projects
2021 Televising and Cleaning
Bidding
Less than $140,000 est. value
Madison, Middleton, Monona, WI

E. Dean Avenue, Allis Avenue, Seth Circle And Tyler Circle Assessment District - 2021
Renovation
Bidding
Less than $5,060,000 est. value
Madison, WI

Sewer Cleaning and Multi Sensor Inspection for the Pumping Station 16 Force Main
Post-Bid
Madison, WI

Stonefield Terrace Phase 2 Public Improvements
Post-Bid
$260,000 est. value
Madison, WI 53717

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

East Side Interceptor and MMSD PS 17 Force Main Relief Phase I
Results
Less than $8,800,000 est. value
Verona, WI

Nine Springs Valley Interceptor Improvements - McKee Road to Dunn`s Marsh
Results
Fitchburg, Madison, WI 53719

CIPP Rehab of Sanitary Sewers
Results
$1,141,590 est. value
Madison, WI 53703

Sanitary Sewer Lining Replacement
Results
Less than $140,000 est. value
Madison, WI 53704

Dunning Street, Jackson Street and Lafollette Avenue Reconstruction Assessment District - 2020
Results
Less than $4,034,805 est. value
Madison, WI 53704

West Interceptor Shorewood Relief Phase 1
Results
$5,400,000 est. value
Madison, WI

2021 East Side Sewer Extension
Results
McFarland, WI

Rockstream Drive Assesssment District - 2020
Results
Less than $2,136,420 est. value
Madison, WI 53719

Cedar Street Assessment District - 2021 And South Street, High Street, And West Wingra Drive Assessment District - 2021
Renovation
Results
$4,348,305 est. value
Madison, WI 53715

2021 CTH MN/Broadhead Street Utility and Street Improvements
Results
McFarland, WI 53558

Last Updated 04/23/2021 03:31 PM
Project Title

Lathrop Drive Utility Replacement - Phase II -GPC

Physical Address View project details and contacts
City, State (County) Madison, WI   (Dane County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $14,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of upgrading underground utilities between Sterling Hall and Park Street along Lathrop Drive. Utilities being upgraded include: New cast-in-place walkable steam tunnel (approximately 125 feet), New steam box conduits (approximately 400 feet), chilled water supply and return lines (approximately 700 feet (each) ), signal and primary ductbanks (approximately 825 feet), water lines (approximately 1000 feet), sewer lines (approximately 700 feet).

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents