Project Title | 2023 Street and Utility Improvements Project |
Physical Address | View project details and contacts |
City, State (County) | Blooming Prairie, MN 55917 (Steele County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,813,460 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Utility Street Construction and Excavation, Sewer and Water Construction, Water Utilities, Sidewalks/curbs/gutters, Stormwater Improvements, Street/roadway Reconstruction , Paving (Highway, Road or Street) In General and Pursuant to Minnesota Statutes, Chapter 429, the Work Consists of the Construction of Water Main Improvements and Street Rehabilitation and Reconstruction With Approximately the Following Quantities: 2225 Lin Ft 8" Dip Water Main/ Pvc Alternate 3575 Lin Ft 6" Dip Water Main/ Pvc Alternate 8 Each Hydrant 25 Each 6"/ 8" Gate Valve and Box 2100 Lin Ft 1" Type "k" Copper Water Service Pipe 56 Each 1" Corporation Stop 55 Each 1" Curb Stop and Box 6738 Cu Yd Common Excavation 5880 Cu Yd Class 5 Aggregate Base 19345 Sq Yd 4.0" Bituminous Pavement Section 8615 Sq Yd 5.0" Bituminous Pavement Section 7525 Lin Ft Concrete Curb and Gutter (B618 and Surmountable) Along With Miscellaneous Items Needed to Reconstruct the Utilities and Roadways. Direct inquiries to Engineer's Project Manager, Brett Grabau, at (507) 529-6030 and Brett.Grabau@Stantec.com. Instructions for viewing the bid opening will be made available through website |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |