Similar Projects
Pre-Qualification for 2021 City Infrastructure Improvement Projects
Bidding
Rochester, NH

Lining Services for Sewer Siphon
Bidding
Less than $175,000 est. value
Hudson, NH

2020 Catch Basin Cleaning
Post-Bid
Atkinson, NH

Wastewater Utility Service FCI Berlin - 120 Months
Post-Bid
Berlin, NH 03570

2019 Sewer Replacement
Results
Goffstown, NH

Woodman Road Sewer Replacement
Results
Durham, NH

2021 Sewer Main Lining Project
Bidding
Lebanon, NH

Catch Basin Cleaning
Post-Bid
Rye, NH

Catch Basin Cleaning and Inspection Services
Results
Somersworth, NH

Catch Basin Cleaning Services
Term Contract
Bidding
Raymond, NH

2021 Catch Basin Cleaning
Term Contract
Post-Bid
Atkinson, NH

2019-2020 Highway Department Items - Catch Basin Cleaning
Term Contract
Results
Pelham, NH

Water and Sewer Utility Improvements
Post-Bid
Less than $4,600,000 est. value
Newmarket, NH

Haigh Avenue Area Sewer Rehabilitation
Results
Salem, NH

Strafford Square Utility Relocation Project
Post-Bid
Rochester, NH

Last Updated 12/04/2019 10:52 AM
Project Title

Underground Utilities Cowper Road

Physical Address View project details and contacts
City, State (County) Wolfeboro, NH   (Carroll County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavate and install an underground conduit infrastructure along a 730 foot section of Cowper Road in preparation of installing new underground utilities. The following contractor requirements are to include but not limited to the following services and scope of work: 1. Excavate along the southern side of road shoulder, 730 feet within the road right-of-way at 48” of depth and 48” wide (See Attachment A. General Project Overview). 2. Install a continuous No.6 solid Copper grounding conductor (provided by WMED)to be directly buried throughout the bottom of the excavated ditch with an additional 10 feet length left accessible above grade at each termination point.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents