Similar Projects
HVAC Filtration Systems Upgrades
Post-Bid
Austell, GA 30106

HVAC and Mechanical Products
Term Contract
Post-Bid

Replace (5) Five HVAC Units with Energy
Results
Atlanta, GA 30312

HVAC Service to Include Repair & Maintenance
Results
Powder Springs, GA

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

GC Services Briar Vista Elementary School Gymnasium HVAC Installation
Results
Less than $134,500 est. value
Atlanta, GA 31324

Sodium Hypochlorite and Fluoride Pump Rooms Ventilation
Alteration
Post-Bid
Marietta, GA 30067

Sparks Hall Phase 2, 4th and 3rd Floor HVAC Upgrades
Results
Less than $1,800,000 est. value
Atlanta, GA 30303

Food and Nutrition Services Summer 2022 Freezer/Cooler Replacement and Renovations
Alteration
Post-Bid
Kennesaw, Mableton, Marietta, GA 30152

Needlepoint Bipolar Ionization Units
Results
Marietta, GA 30060

Addison Elementary School HVAC Modifications 2021
Results
Less than $2,100,000 est. value
Marietta, GA 30066

Hayes ES Mount Bethel ES Lost Mountain MS Cooler Freezer HVAC Replacement
Results
Kennesaw, GA 30152

Chiller and Cooling Tower Maintenance Service
Term Contract
Results
Marietta, GA 30060

30 Ton Rooftop Unit Timber Ridge ES
Results
Marietta, GA 30068

Boilers Replacement Building C And D
Results
$100,000 to $130,000 est. value
Marietta, GA 30060

Last Updated 01/19/2022 09:46 AM
Project Title

Dowell Elementary School HVAC Improvements

Physical Address View project details and contacts
City, State (County) Marietta, GA 30064   (Cobb County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of the following activities: The HVAC equipment for the school will be replaced in its entirety. Included in this list are the water source heat pumps, pumps, boilers, heat exchangers, tempered and condenser water distribution piping, roof top packed units, roof top exhaust fans, kitchen ventilation hood system, air distribution, and flexible ductwork associated with the air distribution. The school has two mechanical equipment rooms; one as the original equipment room, and a newer equipment room dedicated to a previous addition to the school. The original mechanical equipment room will be abandoned (mechanically), and the newer equipment room will be the single central plant for the school. The two existing cooling towers will be removed, and a single, larger cooling tower will be installed outside this equipment room. As part of the non-HVAC scope of work for this project, the ceilings will need to be removed as necessary and replaced when above ceiling work is completed. The new cooling tower will require concrete structural piers and a slab with drainage plumbing to the sanitary system

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents