Similar Projects
13th Drive Road Resurfacing
Infrastructure
Bidding
$300,000 est. value
Friendship, WI 53934

Asphaltic Pavement on Various Roads
Post-Bid
WI

Asphaltic Pavement on Akron Drive
Post-Bid
Adams, WI 54457

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 County Road Improvement Project
Results
Adams, WI 53910

Resurface Fiesta Drive Tri-Project
Post-Bid
Adams, WI

Mauston - IH 39, STH 13 - CTH B
Results
Mauston, WI

Crack Fill and FA-2 Chip Seal 10th Avenue
Post-Bid
Adams, WI

Wisconsin Dells - Adams, Columbia Co Line - Golden Avenue
Results
Wisconsin Dells, WI 53965

Bar Seal and FA-2 Chip Seal Knight Shield Way
Post-Bid
Adams, WI

Seal Coat/Road Oil
Renovation
Results
WI

North Walker Street Paving
Post-Bid
Adams, WI 53910

CTH H Overlay (CTH Z - STH 13)
Results
Adams, WI

Local Road Maintenance
Post-Bid
WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Reported 05/17/2022 12:00 AM
Project Title

Road

Physical Address View project details and contacts
City, State (County) Adams, WI 53910   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Town roads: A. 7th Dr - Seal Coat - 1 mile approximate B. 1980 11th Ave - Seal Coat - Town Hall parking lot C. 14th Ave - Seal Coat - 1 mile approximate D. 16th Ave - Seal Coat - 2 miles approximate E. Deerborn Ave - Seal Coat - 1 mile approximate F. Duck Creek Dr - Seal Coat - 1/2 mile approximate G. 7th Ave off Duck Creek Ave - Full Matt - 340' approximate H. 10th Ave at Dover Dr towards CTH M - Full Matt - 6480' approximate I. Duck Creek Ct - Full Matt - 496' approximate J. Duck Creek Dr - Full Matt - 495' approximate K. 15th Dr - Culvert Installation - 24' approximate All bids must be itemized. Please reference the corresponding letter associated with each repair when preparing your bid. All work must have a completion date of September 30, 2022. It will be the successful bidder's responsibility to provide traffic control and signage to maintain safety while work is completed. The Town Board reserves the right to reject any bids or accept the bid deemed most advantageous to the Town.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents