Similar Projects
Maintenance of Continuous Monitoring Potable Water System
Term Contract
Design
Oklahoma City, OK 73104

Well Pump & Motor Install
Infrastructure
Bidding
Idabel, OK

Semi-Permanent Submersible Chopper Pump
Infrastructure
Post-Bid
Broken Arrow, OK 74012

Water Well Maintenance and Repairs as Needed
Alteration
Post-Bid
Oklahoma City, OK

Installation of Six (6) Groundwater Monitoring Wells
Results
OK

Well Plugging
Results
Oklahoma City, OK

Furnish & Install Two Submersible Water Well Pumps
Alteration
Post-Bid
El Reno, OK 73036

Lawton Groundwater Supply - Treatment Pilot
Results
$305,000 est. value
Lawton, OK 73501

Well No. 7 Improvements
Infrastructure
Post-Bid
Miami, OK

2020 CDBG Reap Water System Improvements
Infrastructure
Results
$420,000 est. value
Kenefic, OK

Hangar 8 Chilled Water Pump Replacement for OCAT
Infrastructure
Results
$557,800 est. value
Oklahoma City, OK 73169

Rotary Pump Water and Sewer Department
Infrastructure
Results
Tulsa, OK

ODVA Replace Geothermal Pumps
Infrastructure
Results
$450,000 est. value
Norman, OK 73071

Hollis Water Well Improvements
Infrastructure
Results
Hollis, OK

Water Well No. 6 Improvements
Infrastructure
Results
Hollis, OK 73550

Reported 04/20/2022 01:37 PM
Project Title

Repair Well Pump

Physical Address View project details and contacts
City, State (County) El Reno, OK 73036   (Canadian County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Water well work at the USDA, ARS, Grazinglands Research Laboratory. Water well #2 is approximately 60 feet deep with water at approximately 11 feet below ground level. The top of the casing is approximately 10 feet above ground level on a raised platform. Casing is believed to be 8in. and necks down to 6in. at around ground level (possibly 10" and necks down to 8") and pipe is believed to be 3"(possibly 2"). Contractor to verify. Piping is insulated and has a heat tape between well and underground supply line to protect against exposure to the elements. Insulation will need to be removed and replaced as necessary.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents