Similar Projects
Glendale Bell Apartments
New Construction
Design
Glendale, AZ 85308

Laveen Village
New Construction - 2,194,616 SF
Post-Bid
$4,000,000 est. value
Laveen, AZ 85339

Resurface and to Perform Structural Repairs to the Miami Hostetler Community Pool
Post-Bid
Miami, AZ

Job Order Contract (JOC) for Pool Repair and Maintenance
Term Contract
Results
Less than $650,000 est. value
Tucson, AZ 85701

Heritage District Redevelopment
Results
Surprise, AZ

Novel Midtown Phoenix
New Construction - 1,515,612 SF
Construction
$45,993,803 est. value
Phoenix, AZ 85013

Fiesta Village Mixed Use Development
New Construction - 80,200 SF
Construction
Mesa, AZ 85210

Affordable Housing Pool
Post-Bid
Tempe, AZ

Repairs and Upgrades to Ora Mae Harn Park Swimming Pool
Results
Marana, AZ 85653

Landing at Union Street at Norterra
New Construction
Construction
Phoenix, AZ 85050

Swimming Pool Maintenance
Results
Chandler, AZ 85225

The Parker
New Construction - 233,700 SF
Construction
$10,000,000 CJ est. value
Tucson, AZ

Rose Lane Aquatics Complex Pool Surface Replacement
Results
Glendale, AZ 85301

Esperanza Condos
New Construction
Construction
Lake Havasu City, AZ

Kierland Residences
New Construction - 532,808 SF
Construction
Scottsdale, AZ 85254

Last Updated 08/17/2020 02:12 PM
Project Title

Fiberglass Waterslides and Water Features Maintenance and Repairs

Physical Address View project details and contacts
City, State (County) Mesa, AZ 85204   (Maricopa County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: A.Annual inspections of waterslides and water features for safety, functionality, and aesthetics shall be completed prior to maintenance work beginning. 1.Inspect slides (while running) for leaks, gasket failures, missing/damaged caulk lines, etc. 2.Inspect slides for proper alignment at ridges/flanges creating a smooth ride for users. 3.Inspect the state of the fiberglass/gel coat of the slides for cracks, chips, and breaks. 4.Inspect the stairs, walkways, handrails, and landings for safety issues, and general appearance. 5.Inspect slides for overall safety of ride and any other relevant findings not listed above that pertain to industry standard. 6.Inspect all hardware for loose/missing connectors. 7.Inspect all connection points for proper operations (attachment points, grease fittings, bushings, etc.) 8.Provide a written inspection report within two (2) working days of completion for each facility detailing the initial findings, recommendations for remedial work, and a quote for extra work to be performed. 9.Pressure wash interior and exterior of slide to remove dirt, oxidation, etc. from fiberglass surface. 10.Wax the interior of slide, paying special attention to the ride surface. 11.Buff the interior of the slide, paying special attention to the ride surface. 12.Chemicals used during this process shall not be allowed to enter the body of water. Remove any residual unused wax. 13.Length and size of slide varies from facility to facility. 14.All work done shall follow the proper procedures and techniques as directed by the manufacturers of the equipment and the products being used. 15.The Contractor shall provide the Parks Contract Representative with Safety Data Sheets (SDS) and on all products prior to their use. 16. Warranty: all work performed shall be warrantied for a period of one (1) year.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents