Similar Projects
The Jade Boynton - Master Plan
New Construction
Conception
Boynton Beach, FL 33473

Region 4 Single Award IDIQ Job Order Construction Contracts (JOCC) for Construction Services In States of AL, FL, GA, KY, MS, NC, SC, & TN
New Construction, Renovation
Design
$2,000 to $5,000,000 est. value

Western Region Wastewater Treatment Facility Operations Building
New Construction, Term Contract - 4,582 SF
Bidding
$4,124,000 est. value
Belle Glade, FL 33430

Clarifier No. 3 Rehabilitation
Renovation, Infrastructure
Bidding
Jupiter, FL 33458

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

Asphalt, Cold Mix, Purchase and Delivery
Term Contract
Post-Bid
FL

Broadway and Blue Heron Block Redevelopment Project
Results
Riviera Beach, FL 33404

General Contractors Prequalification
Results
Less than $1,000,000 est. value
FL

Utility Services Buildings 27 and 48 Renovations
Renovation
Construction
Less than $1,400,000 est. value
Boca Raton, FL 33431

Marshalls - Shell Work and Fit Out
Renovation - 22,399 SF
Construction
$800,000 est. value
West Palm Beach, FL 33401

FAA Airport Traffic Control Tower Design Competition
New Construction
Post-Bid

Wastewater and Reclaimed Water General Construction Services
Results
Jupiter, FL 33458

Unit 2C- Alton Neighborhood 2, Parcel D Improvement Project
Results
Boca Raton, FL

Palm Beach County Waterway Marker Project
Results
FL

Continuing Services for Project Design
Results
$5,000,000 est. value

Last Updated 02/02/2022 03:56 PM
Project Title

Aeration Basin No. 5 Improvements and New Head Works Bypass to Junction Box Project

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33417   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $18,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Management Services (CMS) for the implementation of the Aeration Basin No.5 (AB 5) and New Head Works Bypass to Junction Box Project. The scope of services herein consists of these main components: 1) Dewatering of the ground water surrounding AB No.5 to ensure there are no hydro-static forces placed on the structure. 2) Cleaning of AB 5 to remove all material settled or suspended in the basin. 3) Replacement of the fine bubble diffuser grid system 4) Replacement of the submerged mixers. 5) Addition of a new separation wall to form the anaerobic and aerobic zones 6) Installation of the new bypass structure and screens. 7) All required instrumentation and electrical systems. 8) New headworks bypass system, including modifications to the existing bypass structure at Aeration Basin No. 5, a new coarse screenings facility, a new Junction Box No. 3, and all associated gates, valves, bypass piping, electrical and controls. 9) Upgrades to existing Aeration Basin No. 5, including structural demolition, new baffle walls and walkways, fine bubble diffusers, process air piping and valves, pipe supports, anaerobic zone and swing zone vertical mixers, and modifications to the influent and effluent structures. 10) Electrical power distribution from the existing Blower Electrical Building to Aeration Basin No. 5 and the New Headworks Bypass to Junction Box equipment. 11) Site work, including but not limited to, new process yard piping, grading, and paving.

Details

Division 02 - Existing Conditions, Hazardous Material Assessment, Subsurface Investigation, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents