Similar Projects
Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Post-Bid
Less than $1,600,000 est. value
Lake Placid, NY 12946

Bulwagga Bay Campground Shoreline Assessment and Remediation Plan
Post-Bid
Port Henry, NY 12974

Honey Hill Road Outfall Channel Restoration
Results
Fort Plain, NY

Zukowski Drive Drainage Improvements Phase 1
Results
Less than $300,000 est. value
Garnerville, NY

West Street Drainage Outlet Remediation
Post-Bid
Harrison, NY 10528

Gooseberry Creek Revitalization Strategy โ€“ Creek Walk Park
Results
Less than $300,000 est. value
Tannersville, NY

Corrugated Metal Pipe Arches
Post-Bid
Fort Edward, NY 12828

Monkey Run Road Culvert Replacement
Results
Port Crane, NY

Culvert and Underdrain Pipe and Tubing W/ Arches Bands and Accessories
Term Contract
Post-Bid

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Reconstruction of the Newark Street Drainage Culvert
Term Contract
Post-Bid
Lindenhurst, NY 11757

Replacement of Hannibal Street over Meadow Brook
Term Contract
Results
Fulton, NY 13069

Culvert Replacement Project CR23 (Brook Road) Over Slade Creek, Saratoga Springs
Post-Bid
Ballston Spa, NY 12020

Richbell Road Drainage Improvements at Ridgeway to Ethelridge Road
Results
White Plains, NY

Corrugated Metal Pipe Arches and Aluminized Pipe Arches
Post-Bid
Owego, NY 13827

Last Updated 12/31/2020 08:15 AM
Project Title

Replacement of the Mountain Road Culvert

Physical Address View project details and contacts
City, State (County) Middleport, NY 14105   (Niagara County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $364,930
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists ofโ€ Replacement of 401 LF of an existing stone arch and steel pipe culvert including replacement of wingwalls, an 8โ€ waterline and all excavation, embankment and paving. Project location: On Mountain Road approximately 650 ft. East of the intersection of Mountain Road and Royalton Center Road.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents