Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Palm River Public Utilities Renewal Project Areas 1 and 2
Infrastructure
Design
$14,586,966 CJ est. value
Naples, FL 34120

Palm River Public Utilities Renewal Project Areas 1 and 2
Infrastructure
Design
$14,586,966 CJ est. value
Naples, FL 34120

Churchill Circle Water Main Replacement
Infrastructure
Bidding
$1,470,000 CJ est. value
Naples, FL 34116

Churchill Circle Water Main Replacement
Infrastructure
Bidding
$1,470,000 CJ est. value
Naples, FL 34116

Master Pump Station 302.00 Site Improvements
Alteration
Post-Bid
$2,085,000 est. value
FL

Master Pump Station 302.00 Site Improvements
Alteration
Post-Bid
$2,085,000 est. value
FL

Lowdermilk Park - ATV Storage Building - Re-Bid
New Construction, Infrastructure - 9,000 SF
Results
$359,530 CJ est. value
Naples, FL 34102

Utilities Repair and Maintenance Contractor Library
Infrastructure
Results
Naples, FL

Temple Shalom Community Facility - Sitework
New Construction
Construction
$100,000 est. value
Naples, FL 34116

St. Matthew's House Renovation
Addition, New Construction, Renovation, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Naples, FL 34112

Unidos Restaurant
Renovation, Infrastructure - 5,625 SF
Pending Verification
$150,000 CJ est. value
Naples, FL 34102

Sidewalk/Milling and Resurfacing/Base Work
Infrastructure
Design
$4,361,899 CJ est. value
Everglades City, FL 34139

Sava Restaurant
Infrastructure, Renovation - 2,974 SF
Bidding
$200,000 CJ est. value
Naples, FL 34102

105th Ave North And 106th Ave North Public Utilities Renewal
Infrastructure
Post-Bid
North Naples, FL 34108

Last Updated 08/22/2022 05:03 PM
Project Title

Golden Gate City Transmission Water Main Improvements Phase 2

Physical Address View project details and contacts
City, State (County) Golden Gate, FL 34116   (Collier County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $6,737,736 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Q & A deadline: Jun 17, 2022 5:00:00 PM EDT Each bid shall be accompanied by a certified or cashier's check or a Bid Bond in an amount not less than five percent (5%) of the total Bid to be retained as liquidated damages in the event the Successful Bidder fails to execute the Agreement and file the required bonds and insurance within ten (10) calendar days after the receipt of the Notice of Award. The Successful Bidder acknowledges and agrees that it shall execute the Agreement in the form attached hereto and incorporated herein. The Successful Bidder shall be required to furnish the necessary Payment and Performance Bonds, as prescribed in the General Conditions of the Contract Documents. All Bid Bonds, Payment and Performance Bonds, Insurance Contracts and Certificates of Insurance shall be either executed by or countersigned by a licensed resident agent of the surety or insurance company having its place of business in the State of Florida. Further, the said surety or insurance company shall be duly licensed and qualified to do business in the State of Florida. Attorneys-in-fact that sign Bid Bonds or Payment and Performance Bonds must file with each bond a certified and effective dated copy of their Power of Attorney. In order to perform public work, the Successful Bidder shall, as applicable, hold or obtain such contractor's and business licenses, certifications and registrations as required by State statutes and County ordinances. Before a contract will be awarded for the Work contemplated herein, the Owner shall conduct such investigations as it deems necessary to determine the performance record and ability of the apparent low Bidder to perform the size and type of work specified in the Bidding Documents. Upon request, the Bidder shall submit such information as deemed necessary by the Owner to evaluate the Bidder's qualifications. The Successful Bidder shall be required to finally complete all Work within Five Hundred and Seventy (570) calendar days from and after the Commencement Date specified in the Notice to Proceed. The final completion days includes substantial completion days of Five Hundred and Forty (540) calendar days, with an additional Thirty (30) calendar days to final completion. Should Contractor fail to achieve Substantial Completion within the number of calendar days established herein, Owner shall be entitled to assess, as liquidated damages, but not as a penalty, Three Thousand Four Hundred and Forty-Seven Dollars ($3,447) for each calendar day thereafter until Substantial Completion is achieved. Unless otherwise specified, work will be limited to the hours of 7:00 a.m. to 7:00 p.m., Monday through Friday. The Owner reserves the right to reject all Bids or any Bid not conforming to the intent and purpose of the Bidding Documents, and to postpone the award of the contract for a period of time which, however, shall not extend beyond one hundred eighty (180) days from the bid opening date without the consent of the Successful Bidder.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents